BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2020 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Wenatchee, Washington. Working plans call for site work for a water / sewer project.

Installation of two concrete floats in the Rocky Reach Trash Boom Forebay. Personal Protective Equipment (PPE) is required at this location in order to attend the site. The following PPE is required to be used by all attendees: shirts with sleeves and full length trousers, sturdy leather footwear, steel-toed boots, eye protection, hard hat, ear protection, and safety vest. *This project timeline has been extended due to the public health crisis.

Final Planning

Water / Sewer

$409,600.00

Public - County

Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
7
Bidding Soon
311
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2020

December 16, 2020

Project location map

5695 US-97 ALT, Wenatchee, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.