BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cary, North Carolina. Design plans call for site work for a water / sewer project.

As of January 13, 2021, this project is currently in the preliminary design phase. A timeline for bidding has not been established yet. Construction is not expected to begin prior to Summer 2022. Thanks, *The original solicitation is listed below for reference. --- The Town of Cary is seeking the services of a professional engineering firm to provide design and construction period services for the West Cary Force Main Improvements Project along Green Level Church Road. The proposed improvements are aimed at improving reliability, capacity and operational flexibility of this force main system, which transports a major portion of the wastewater flow in Cary Western Service Area to the Western Wake Regional Water Reclamation Facility (WWRWRF). The goals of this project include: A. Replacement or renewal of approximately 3,000 feet of existing 24-inch ductile iron force main. B. Installation of parallel or redundant force main pipe beginning approximately 700 feet south of Cary Glen Boulevard to the discharge location approximately one mile south along Green Level Church Road near Millercrest Lane. Figure 1 details the configuration of the existing force main system. C. Perform pipeline cleaning of the existing 24-inch force main D. Improve odor control operations downstream of the existing force main discharge on the Green Level Interceptor gravity sewer. Questions Due Date: Monday, June 24, 2019 no later than 2:00 PM ET Direct Inquiries To: Lynn Brilz, P.E. Senior Project Manager (919) 460-1047 Lynn.Brilz@townofcary.org The current available funding for this project is $2.8 million. Additional funding will be requested in future Capital Improvement Budgets. The Town has currently programmed an additional $2 million in funding for Fiscal Year 2021 (July 1, 2021 to June 30, 2022) and another $2 million in funding for FY 2022. An additional $600,000 is available for odor control improvements. The selected consultant shall be prepared to design and bid the project in two phases, to enable construction of the parallel force main and upgrades to the existing force main to commence on Town-owned property while additional property is being procured for the remainder of the parallel force main.

Design

Water / Sewer

$2,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
63
Bidding Soon
1,222
All Active Projects
482
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.