BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2019 at 8:00 PM

Updated March 17, 2026

Site work, paving and renovation of a civil project in Wellton, Arizona. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for the renovation of a bridge / tunnel.

Tracs No 008 YU 046 F009301C Proj No NHPP-008-A(232)T Termini Yuma-casa Grande Highway (I-8) Location MP 46 - SW of Dateland Route No. Milepost District Item No. I-8 46.00 to 68.00 Southwest 7867 The proposed project is located in Yuma County on Interstate 8 from MP 46 to MP 68 near Dateland. The work consists of pavement & bridge rehabilitation and gore area improvements. The work includes milling and repaving of mainline, shoulders, cross road, gore areas, ramps, bridge decks and slabs; removing and replacing cattle guards, guard rails, spillways; shoulder build-up, pipe lining, pavement marking, rumble strips, installing wrong way sign , replacing outdated signs to MUTCD standard and other related work. The time allowed for the completion of the work included in the Construction Phase of the contract will be 300 working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 4.17. To submit a valid bid, the bidder must (1) have prequalification from the Department as necessary for the project, and (2) be included on the project Plansholder List as a Prime. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. This project requires electronic bidding. If a request for approval to bid as a Prime Contractor is received less than 48 hours prior to bid opening, the Department cannot guarantee the request will be acted on. This contract is subject to the provisions of Arizona Revised Statutes Section 42-5075 -- Prime contracting classification; exemptions; definitions. No award will be made to any contractor who is not a duly licensed contractor in accordance with Arizona Revised Statutes 32-1101 through 32-1170.03. All labor employed on this project shall be paid in accordance with the minimum wage rates shown in the General Wage Decision. These rates have been determined in accordance with the requirements of the law and issued by the Secretary of Labor for this project. The wage scale is on file in Contracts and Specifications Section and copies may be obtained at all reasonable times. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. Questions and comments concerning the bid package for this project shall be directed to the individuals noted below: Engineering Specialist: Sarker Rahman SRahman@azdot.gov Construction Supervisor: Jaime Hernandez jhernandez@azdot.gov AZDOT - Yuma - Casa Grande Highway ( I-8) (MP 46 - SW of Dateland)

Award

Bridges / Tunnels

$18,765,432.00

Public - State/Provincial

Paving, Renovation, Site Work

137

5

8

13

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
32
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2019

September 27, 2019

Project location map

I-8, Wellton, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.