EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2019 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Auburn, New York. Completed plans call for the renovation of a water / sewer project.

The Owner reserves the right to waive any informality or to reject any or all bids.Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders.Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and prevailing wage rates to be paid under the contract.The Owner is exempt from the payment of sales and compensating use taxes of the State of New York and of cities and counties on all materials, equipment and supplies sold to the Owner pursuant to this Contract. Also exempt from such taxes are purchases by the Contractor and his Subcontractors of materials, equipment, and supplies to be sold to the Owner pursuant to this Contract, including tangible personal property to be incorporated in any structure, building, or other real property forming part of the Project. These taxes are not to be included in the Bid.No bidder may withdraw his bid within 45 days after the actual date of opening thereof.

Award

Water / Sewer

$1,895,000.00

Public - City

Renovation

18

1

2

9

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Quality Control, Temporary Facilities and Controls, Temporary Construction, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Site Maintenance, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions, Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Metal Building Systems
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Hangers and Supports for Fire-Suppression Piping and Equipment, Fire-Suppression Water Storage, Storage Tanks for Fire-Suppression Water
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Potable-Water Storage Tanks, Pool and Fountain Plumbing Systems, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Gas Storage Tanks for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Facility Fuel Systems, Facility Fuel-Storage Tanks, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Fuel Distribution Utilities, Fuel-Storage Tanks, Aviation Fuel-Storage Tanks, Compressed Gases Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Gas and Vapor Process Piping, Liquids Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
99
Bidding Soon
1,111
All Active Projects
544
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2019

August 30, 2019

img_map_placeholder

35 Bradley St, Auburn, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

WWTP UV Disinfection System Replacement Contract No. 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.