BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and addition to a bridge / tunnel in North Castle, New York. Completed plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the addition of a bridge / tunnel.

The Town of North Castle seeks proposals from qualified contractors that are interested in providing services for the Wampus Brook Park North Bridge Replacement within the Town of North Castle, Westchester County, New York. The project includes the removal and replacement of the north pedestrian bridge with a field-constructed timber bridge as described more fully in these bid documents. General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % Job Location Wampus Brook Park North Bridge, Armonk, NY Bid Intent Deadline 07/28/2022 11:00 AM EDT Question Acceptance Deadline 07/14/2022 04:00 PM EDT Questions are submitted online No Project Number Wampus Brook Park NORTH Bridge 2022 DESCRIPTIONOFWORK The project includes the removal and replacement of the north pedestrian bridge with a field-constructed timber bridge. The Contractor will be responsible for demolition, removal and off-site disposal of the existing timber pedestrian bridge. All components of the existing bridge, with the exception of the concrete foundations which may require minor modification, are to be demolished. The existing cobblestone aprons at each end of the bridge may also require removal and resetting to accommodate proper construction of the new bridge. The proposed pedestrian bridge shall be constructed of an engineered lumber structure and plastic lumber handrail system and decking as detailed and specified on the Contract Drawings. The Contractor shall construct the bridge in the field. Available staging areas will be provided within the Wampus Brook Park. The Contractor shall maintain safe and adequate pedestrian access through the park at all times. Specifically, access from the Maple Avenue parking lot and park entrance to the south end of the pond and trailway around the east side of the pond must remain open to pedestrians. Limited closure of sections of this trail may be permitted only after prior approval by the Town.

Post-Bid

Bridges / Tunnels

$500,000.00

Public - City

Addition, Demolition, Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
505
Active Projects
299
Bidding Soon
4,312
All Active Projects
1,963
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

August 29, 2022

img_map_placeholder

To Be Determined, North Castle, NY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.