EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2019 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a warehouse / distribution facility in Lewiston, New York. Completed plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

Project Location: 1. Harold Road near the Town Highway Department located on 1445 Swann Road, Lewiston, New York 14092 WORK COVERED BY CONTRACT DOCUMENTS A. Police and Parks Storage Building Project 1. General: It is the intent and purpose of these Specifications and accompanying Contract Drawings to describe the Work associated with and included under the Police and Parks Storage Building Project. 2. The CONTRACTOR shall return to original condition, satisfactory to OWNER and ENGINEER, any damaged facilities caused by the CONTRACTOR's operations at the CONTRACTOR's expense. 3. It is to be understood that the CONTRACTOR is responsible to provide all traffic control, flagmen, and trucking necessary for the completion of the work under this Contract as described in the Contract Drawings. 4. It is the CONTRACTOR's responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the safety plan to be used during the work, and a schedule defining the duration of the work with milestone subtasks. 5. The CONTRACTOR shall supply all supervision, labor, equipment, materials, and incidentals required to complete the work outlined in this section unless specified otherwise. The Work under the project includes, but is not limited to, the following: CONTRACT NO. 2019-1G - GENERAL (BASE BID ITEMS) a. Item 1 - Police and Parks Storage Building Under this Item, the CONTRACTOR shall provide all labor, materials, tools, and equipment required to perform mobilization and demobilization. Work under this Item shall include set up of the necessary general plant, including shops, storage areas, sanitary and other facilities as are required by local or state law or regulation. The cost of required insurance, bonds, permits, work schedule and subsequent updates and any other initiation of the Contract work is also included in this Item. Also, under this Item, the CONTRACTOR shall provide all labor, materials, tools, and equipment required for the new Police and parks Storage Building and associated appurtenances as shown on the Contract Drawings and described in these Specifications. This work includes, but is not limited to, the following: 1. Complete all site clearing and grubbing including tree and stump removal to the extents indicated on the Contract Drawings. 2. Regrade site to finished grade indicated on Contract Drawings. CONTRACTOR shall be responsible for soil balance, density testing and compaction, and installation of any import fill/select fill as required to achieve finished grade. The removal, transport, import of fill materials, and disposal of excavated soils and rocks and cleared trees and shrubbery are by OWNER. Supply and install grass seeding to disturbed soil areas. 3. CONTRACTOR shall dispose of and/or pile materials at an on-site location or load onto OWNER-provided trucking for disposal as directed by OWNER/ENGINEER. OWNER shall provide all fill materials for the project. CONTRACTOR shall notify OWNER/ENGINEER immediately should CONTRACTOR compaction testing results not meet contract specifications. 4. Provide and install temporary silt fence and other stormwater pollution prevention measures as required to maintain existing drainage and protect stormwater facilities and waterways from sediment-laden runoff. 5. Provide stabilized construction entrance. CONTRACTOR shall install aggregate at temporary site access drive. Temporary drive shall be built up, as required to maintain local roads free of dirt and mud tracked off site. 6. Supply and install concrete floor slabs, vapor barrier, floor slab rigid insulation, pads, and foundations. 7. Supply and install pre-engineered factory and field fabricated building, including all equipment, fixtures, and appurtenances as specified in Section 13121. 8. Supply and install splash pads at the outlet of each roof gutter downspout. 9. Supply and install four multi-purpose ABC fire extinguishers with wall-mounting hardware. Locations directed by Owner. 10. Supply and install truss identification stickers. 11. Supply and install new bollards and guide rail systems as shown on the Contract Drawings. 12. Provide and install temporary generator and wiring to test garage door and fan operation.

Award

Warehouse / Distribution

$507,692.00

Public - City

New Construction, Site Work

9

10

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 08 - Openings

Division 08 - Openings

Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
204
Bidding Soon
3,143
All Active Projects
1,398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2019

August 7, 2019

img_map_placeholder

Harold Rd, Lewiston, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Police and Parks Storage Building Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.