BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2020 at 8:00 PM

Updated November 15, 2023

Renovation of an educational facility in Park Hall, Maryland. Completed plans call for the renovation of a educational facility.

AS of June 30 2020 this project is complete. As part of the annual update of the CMP, the roof and HVAC replacement projects are reviewed and were combined into one project. This will enable the utilization of a single AE team, roofing consultant, and prime contractor. This will ensure coordination, consistency, and efficiency and has been a method successfully utilized in similar past projects. Included is approximately 35,000 sq. ft. of existing coal tar roofing which was replaced in 1989 and 28,000 sq. ft. of built-up roofing (including canopies), some of which is single ply. The existing built-up roof will be replaced with a 4-ply built up roof with a 1/4" slope, with alternates for any potential cost overages. Based on the height of the new tapered insulation, work will be done on the through wall flashing at adjoining walls. Overflow drains are not conforming and will require interior plumbing work. The HVAC system was also installed in 1994 and requires replacement. This includes the following equipment: one water chiller, two boilers, five rooftop units, twenty eight unit ventilators, nine fan coil units, two cabinet heaters, making one air handling unit OA, one five ton system, and fifteen exhaust fans, with all related accessories and controls. In addition, low voltage data systems will be reviewed and included in the project, if warranted. These include PA, fire, and security systems. Maintenance monitors the roof and HVAC system and provides repairs on an as-needed basis, pending the replacements. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Occupancy

Educational

$1,725,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
427
Active Projects
175
Bidding Soon
2,890
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2020

Project location map

20343 Hermanville Rd, Park Hall, MD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.