BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Wasaga Beach, Ontario. Completed plans call for site work for a bridge / tunnel.

For rehabilitation of the Main Street Bridge over the Nottawasaga River. The Main Street Bridge, constructed circa 1960, is located west of River Road East, over the Nottawasaga River, and comprises a section of Main Street at the entrance to Beach Areas 1 and 2. a) Removal of existing expansion joints and conversion to semi-integral, b) Modifications to abutments and wingwalls to accommodate semi-integral conversion, c) Refacing of existing abutments, d) Partial length full depth removal and replacement of existing concrete deck and sidewalks, e) Partial depth concrete removal and patching of concrete on bridge deck, soffit and wingwalls, f) Concrete removal and overlay of existing sidewalks and curb faces on bridge, g) Minor widening of bridge deck/sidewalk, h) Partial length removal and replacement of existing structural steel i) Coating (painting) of existing and new structural steel, j) Replacement of abutment bearings, k) Removal and replacement of existing approach slabs, l) Construction of new sleeper slabs at ends of approach slabs, m) Removal and replacement of bridge deck drains n) Removal and replacement of bridge barrier system o) Installation of new street lighting and navigation lights on bridge p) Removal of existing watermain on north side of bridge and replacement with new watermain on the south side, q) Removal and replacement of bridge deck waterproofing, r) Full depth removal of asphalt and repaving on bridge and approaches, s) Replacement of sidewalk and curb and gutter on bridge approaches, t) Installation of new steel beam guide rail on bridge approaches, u) Pavement markings from River Road East to 6th Street to accommodate new bike lanes, and v) Site restoration including topsoil and sodding of all disturbed areas *Contract award amount was not released for publication.

Award

Bridges / Tunnels

$6,100,000.00

Public - City

Site Work

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
77
Bidding Soon
1,771
All Active Projects
715
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 4, 2019

September 2, 2019

img_map_placeholder

Main St, Wasaga Beach, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.