BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2021 at 8:00 PM

Updated September 15, 2023

Remodeling of a mixed-use development in Dallas, Texas. Conceptual plans call for the remodel of a transportation facility.

The Commerce alignment begins south of Victory Station. It moves south through a switch off the existing railroad alignment and then proceeds in a southeasterly direction along DART-owned right-of-way within Victory Park in the center of Museum Way and through the parking lot on the west side of the Perot Museum of Nature and Science. Adjacent to the Perot Museum will be an at-grade light rail station (Museum Way Station). After leaving the station southbound, the alignment crosses under Woodall Rodgers Freeway at street level, and then begins its transition underground. The alignment enters a property currently occupied by a parking lot and descends into a tunnel within the portal. The alignment remains underground through the core of Downtown until it reaches IH 345 on the east end of Downtown. After passing under Hord Street near the Dallas World Aquarium, the alignment turns under Griffin Street. Between San Jacinto Avenue and Elm Street would be an underground station (Metro Center Station). This station would provide the ability to transfer to the West Transfer Center, Rosa Parks Plaza, and the West End and Akard light rail stations. After crossing under Main Street, the alignment turns east under Belo Garden and continues under Commerce Street. While under Commerce, another underground station is planned approximately between Akard and Ervay Streets (Commerce Station). After passing under Harwood Street, the alignment turns northeast and diagonally across surface parking lots and between buildings. There would another underground station (CBD East Station) between Main Street and Pacific Avenue. This station would provide opportunities to transfer to buses at the East Transfer Center. After passing under Cesar Chavez Boulevard the alignment would begin the transition back to the surface. This transition or portal would be under IH 345 and adjacent to Swiss Avenue. Immediately after getting back to the surface, the alignment arrives at a switch that allows trains to travel either north or south along rebuilt Good Latimer tracks. As of September 30, 2021, this project is in the conceptual phase. The DART has completed the draft for the environmental impact statement. Design is estimated to take place in late 2021/early 2022. Information regarding contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Transportation Terminals

$1,700,000,000.00

Public - Federal

Remodeling

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
90
Bidding Soon
4,025
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.