BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Buffalo Grove, Illinois. Design plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

As of May 2024, the project is in early design. Contractor bidding and construction are not expected to commence until 2029. The previous solicitation is listed below for reference. --- In addition to phase II design engineering, the work will include field survey; plats and legal descriptions for right-of-way and easement acquisitions; sidewalk and ADA ramp improvements; culvert, storm sewer and stormwater detention design; wetland delineation; non-motorized travel accommodations; soils investigation; landscaping; hosting a public information meeting and an environmental assessment (PESA and PSI). Coordination with utility companies, permitting agencies, IDOT, Canadian National Railway, Illinois Commerce Commission and local communities will be part of the work. It is anticipated that local funds will be used for engineering and construction. The basis of evaluation will be 20% technical approach, 15% firm experience, 10% specialized expertise, 20% team capabilities, 10% workload capacity, 10% public outreach experience, 10% past performance and 5% local presence. 2. Section No. 15-00038-07-WR: Phase II design engineering, in accordance with the Project Report and the Illinois Department of Transportation's Bureau of Local Roads & Streets Policies & Procedures, for the reconstruction of Deerfield Road from IL Route 21/US Route 45 to Saunders/Riverwoods Road. Anticipated Phase II work will include field surveys; preliminary, prefinal, and final plans, specifications and cost estimates; coordination with permitting agencies, local communities and utility companies; soils analysis; structural design work for retaining walls and bridge widening; culvert, storm sewer and stormwater detention design; pavement life cycle cost analysis; sidewalk and ADA ramp improvements; a determination of proposed right-of-way and/or easements and the preparation of plats and legal descriptions and public

Design

Roads / Highways

$8,000,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
126
Bidding Soon
2,131
All Active Projects
938
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2029

img_map_placeholder

N Buffalo Grove Rd, Buffalo Grove, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.