BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 11, 2019 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Frankfort, Kentucky. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Kentucky Transportation Cabinet (KYTC) will be seeking teams of Contractors and Consultants for an upcoming Design-Build project to replace approximately 100 bridges that are part of the Cabinet's Bridging Kentucky program. Bridges that will be included in this Design-Build project are concentrated primarily in Eastern and Southeastern Kentucky. All questions prior to the award shall be directed to: Name: Rachel Mills, P.E., Director, Division of Construction Procurement Phone: 502-564-3500 Email: Rachel.Mills@ky.gov Project Schedule July 15, 2019 Short-list July 15, 2019 Issue Draft Instructions to Proposers (ITP) September 5, 2019 Last Day for Questions September 6, 2019 Responses to all Questions Issued September 9, 2019 Final ITP Issued September 30, 2019 Technical Proposals Due October 7, 2019 Price Proposals Due October 14, 2019 Project Award November 1, 2023 Project Completion Date It is required that the Design Build Team (DBT) consist of a KYTC pre-qualified Contractor who has engaged the services of KYTC pre-qualified Design Consultant(s) to perform all work required in the forthcoming ITP. If the Design Consultant(s) submitted does not meet all the required qualifications, KYTC may reject the DBT's SOQ. All sub-consultants and subcontractors utilized by the DBT on this project shall be pre-qualified to perform work for KYTC or their services shall not be allowed. Acceptable SOQ will require the project team to be prequalified in the specified areas by the SOQ due date as detailed in sections 5.1.1 and 5.1.2. If there are questions concerning designer prequalification, contact Mr. Eric Pelfrey, PE 502-564-4555. For questions regarding contractor prequalification, contact Rachel Mills at 502-564-3500. Responses that do not have all areas of prequalification fulfilled will be returned. KYTC - Design Build - Bridging Kentucky Bridge Replacement Projects The DBE goal established for this contract is 4% of the total value of the contract.

Bid Results

Bridges / Tunnels

$93,306,747.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
145
Bidding Soon
1,745
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2019

December 6, 2019

Project location map

Multiple Locations, Frankfort, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.