Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Wauwatosa, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
For sanitary and storm sewer construction, sanitary sewer lining and grouting, asphalt resurfacing including but not limited to milling, grading, concrete curb and gutter replacement, asphalt pavement, concrete sidewalk, electrical, street lighting, and work incidental thereto in portions of: N. 84TH ST: From: W. Center St. To: W. Wright St Alley 'St. Paul Ave': From: W. Bluemound Rd. To: W. Mount Vernon Ave. AND From: N. 67th St. To: N. 68th St. all in accordance with contract documents. All proposals must be submitted in electronic format together with a bid bond equal to five (5) percent of the bid payable to the City of Wauwatosa, Wisconsin, as a guarantee that if his bid is accepted, the successful bidder will execute and file the proper contract and bonds within ten (10) days after notification of award of the contract. Failure on the part of the successful bidder to execute his contract and performance and labor & material payment bonds within ten (10) days from the date of notice of the award of contract will be considered as just cause for the annulment of the award and the forfeiture of the proposal guarantee to the City not as a penalty but in payment to the City as liquidated damages as a result of such failure. No bid shall be withdrawn after the opening of bids for a period of sixty (60) days after the scheduled time of closing of bids. The letting of the work described herein is subject to the provisions of Section 66.09, Wisconsin Statutes, requiring the bidder to furnish proof of responsibility. Bidder prequalification is required on forms furnished by the City of Wauwatosa and submitted to the City Engineer. Prequalification forms that are submitted after 5 days preceding the contract letting date may be cause for the rejecting of bids. TIME OF SUBSTANTIAL COMPLETION The substantial completion date for Contract 19-24 2019 STREET AND UTILITY IMPROVEMENTS NO. 2 shall be NOVEMBER 1, 2019. See Section 600 for additional completion requirements. There will be no other extension of time and no extenuating circumstances, except perhaps an industry strike, or the inability of the City to receive plan and specification approval. If the contractor does not complete the work on or before the date set forth above for CONTRACT 19-24 2019 STREET AND UTILITY IMPROVEMENTS NO. 2 or within the extra time allowed under a City Engineer granted time extension, the City will assess liquidated damages. The City will deduct One Thousand Two Hundred and Fifty Dollars ($1250.00) for every calendar day that the work remains uncompleted from payments due the contractor. The Contractor will also be charged for each and every day inspection is required after the time of completion has expired. This charge will be based on the actual costs of inspection, construction supervision, clerical and administrative costs, traffic control and overhead charges. A required Affidavit of Compliance is included in Section 300 and must be submitted with the bid. The right to reject or accept any or all bids and the right to waive any informality in bidding is reserved to the City of Wauwatosa, Wisconsin.
Award
Roads / Highways
$1,048,637.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 27, 2019
July 29, 2019
Multiple Locations, Wauwatosa, WI
Related To This Project
Wauwatosa, WI
Bid Date: Jun 13 2019
Wauwatosa, WI
Bid Date: Dec 11 2019
Wauwatosa, WI
Bid Date: Mar 12 2020
Wauwatosa, WI
--
Wauwatosa, WI
--
Wauwatosa, WI
Bid Date: Mar 01 2023
Wauwatosa, WI
Bid Date: May 23 2022
Wauwatosa, WI
--
Wauwatosa, WI
Bid Date: Jan 30 2020
Wauwatosa, WI
Bid Date: Feb 13 2020
Wauwatosa, WI
Bid Date: Apr 15 2020
Wauwatosa, WI
Bid Date: Apr 15 2022
Wauwatosa, WI
Bid Date: Jan 25 2023
Wauwatosa, WI
Bid Date: Dec 14 2022
Wauwatosa, WI
Bid Date: Jan 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.