BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2019 at 8:00 PM

Updated September 14, 2023

Site work, paving and outdoor lighting for a mixed-use development in Wauwatosa, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

For sanitary and storm sewer construction, sanitary sewer lining and grouting, asphalt resurfacing including but not limited to milling, grading, concrete curb and gutter replacement, asphalt pavement, concrete sidewalk, electrical, street lighting, and work incidental thereto in portions of: N. 84TH ST: From: W. Center St. To: W. Wright St Alley 'St. Paul Ave': From: W. Bluemound Rd. To: W. Mount Vernon Ave. AND From: N. 67th St. To: N. 68th St. all in accordance with contract documents. All proposals must be submitted in electronic format together with a bid bond equal to five (5) percent of the bid payable to the City of Wauwatosa, Wisconsin, as a guarantee that if his bid is accepted, the successful bidder will execute and file the proper contract and bonds within ten (10) days after notification of award of the contract. Failure on the part of the successful bidder to execute his contract and performance and labor & material payment bonds within ten (10) days from the date of notice of the award of contract will be considered as just cause for the annulment of the award and the forfeiture of the proposal guarantee to the City not as a penalty but in payment to the City as liquidated damages as a result of such failure. No bid shall be withdrawn after the opening of bids for a period of sixty (60) days after the scheduled time of closing of bids. The letting of the work described herein is subject to the provisions of Section 66.09, Wisconsin Statutes, requiring the bidder to furnish proof of responsibility. Bidder prequalification is required on forms furnished by the City of Wauwatosa and submitted to the City Engineer. Prequalification forms that are submitted after 5 days preceding the contract letting date may be cause for the rejecting of bids. TIME OF SUBSTANTIAL COMPLETION The substantial completion date for Contract 19-24 2019 STREET AND UTILITY IMPROVEMENTS NO. 2 shall be NOVEMBER 1, 2019. See Section 600 for additional completion requirements. There will be no other extension of time and no extenuating circumstances, except perhaps an industry strike, or the inability of the City to receive plan and specification approval. If the contractor does not complete the work on or before the date set forth above for CONTRACT 19-24 2019 STREET AND UTILITY IMPROVEMENTS NO. 2 or within the extra time allowed under a City Engineer granted time extension, the City will assess liquidated damages. The City will deduct One Thousand Two Hundred and Fifty Dollars ($1250.00) for every calendar day that the work remains uncompleted from payments due the contractor. The Contractor will also be charged for each and every day inspection is required after the time of completion has expired. This charge will be based on the actual costs of inspection, construction supervision, clerical and administrative costs, traffic control and overhead charges. A required Affidavit of Compliance is included in Section 300 and must be submitted with the bid. The right to reject or accept any or all bids and the right to waive any informality in bidding is reserved to the City of Wauwatosa, Wisconsin.

Award

Roads / Highways

$1,048,637.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
178
Bidding Soon
2,115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2019

July 29, 2019

Project location map

Multiple Locations, Wauwatosa, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.