Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in North York, Ontario. Design plans call for site work for a road / highway; and for paving for a road / highway.
Construction of a new grade-separated crossing of the Canadian Pacific Rail (CPR) corridor providing pedestrians and cyclists a connection to the Don Mills Trail from the Wynford Green Drive extension. The bridge will connect people walking and cycling between the Don Mills Trails north of the rail corridor to the proposed community and ravine and trail system to the south. The structure includes: 6.1 metre wide open-air bridge for pedestrians and cyclists, Steel I-girder structure, Accessible elevated ramps, an additional staircase connecting the bridge for more direct travel to Street C. TIMELINE: The Consultant has completed the Don Mills Crossing Trail Bridge Municipal Class Environmental Assessment (EA) to identify a recommended plan for a new pedestrian and cyclist bridge crossing the Canadian Pacific rail corridor to connect the existing Don Mills trail to the Wynford Drive extension. The Environmental Study Report has been completed approved. The developers of 844 Don Mills Rd are leading detailed design and construction with the City of Toronto providing oversight. Detailed design is underway and is expected to carry on into late 2025.
Design
Roads / Highways
$8,000,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2025
Don Mills Trail, North York, ON
Related To This Project
North York, ON
--
North York, ON
Bid Date: Mar 15 2019
North York, ON
Bid Date: Aug 11 2020
North York, ON
--
North York, ON
--
North York, ON
--
North York, ON
--
North York, ON
--
North York, ON
--
North York, ON
Bid Date: Apr 03 2020
North York, ON
Bid Date: Oct 26 2017
North York, ON
--
North York, ON
--
North York, ON
Bid Date: Apr 25 2019
North York, ON
Bid Date: Oct 30 2018
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.