Published November 24, 2022 at 7:00 PM

Updated October 1, 2024

Site work and paving for a civil project in North Vernon, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.

Project Control No. 1592223, 1592224, 1802827 Federal/State No. 159222300ST5, 159222400ST5, 180282700ST5 Intersection Improvement With Added Turn Lanes Jennings County - on Sr 7 From 500 Ft S of Cr 275w to 300 Ft N of Cr 300w (Rp 026+0083 to 027+0040) Auxiliary Lanes, Passing Jennings County - on Sr 7 at Cr 900n From 8.27 Mi N to 8.44 Mi N of Sr 750 (Rp 034+0020 to 034+0038) Small Structure Replacement Cv 007-040-26.88 Culvert Jennings County - on Sr 7, 2.0 Miles North of Sr 3 (Rp 026+0089) Contractors desiring to submit electronic bids via electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the electronically bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 231 - Intersect Improve With Added Turn Lanes and Str Replacement Project Description: Des. Nos. 1592223 and 1802827: This proposed project is located at SR 7 and begins approximately 500 feet south of County Road (CR) 275 West and extends north 0.57 mile terminating approximately 300 feet north of CR 300 W. The project area includes the intersections with CR 275 W, Country Squire Boulevard, the commercial entrance to Dollar General, and CR 300 W in Queensville, Jennings County, Indiana. The project area is more specifically located on the North Vernon United States Geological Survey (USGS) 7.5 Topographic Quadrangle Map in Sections 19 and 20 of Township 7 North, Range 8 East. The current proposed project will adjust the vertical alignment of SR 7 to meet stopping sight distance standards for a 50 mph design speed. Drives along the corridor will have their approaches adjusted to accommodate the change in vertical alignment and to meet acceptable INDOT Standards. The intersection of SR 7 and CR 300 W will be reconstructed to tie into the proposed vertical profile of SR 7. Pavement will be replaced or rehabilitated as feasible within project limits. The intersection of SR 7 with CR 275 W will be closed. It is anticipated that a cul-de-sac will be constructed on CR 275 W. A left turn lane will be installed on northbound SR 7 for a designated left turn lane to Country Squire Boulevard and to the Dollar General and the current substandard passing blister at Country Squire Boulevard will be removed. Additionally, the existing 60-foot long, five-foot tall, and five-foot wide reinforced concrete box culvert that is located on SR 7 just north of the intersection of CR 275 W (CV 007-040-26.88) will be replaced, lengthened, and upsized. A review of the USFWS database on May 7, 2019 did not indicate the presence of endangered bat species in or within a half mile of the project area. Some suitable bat summer habitat is within and adjacent to the project area. It is anticipated that approximately 0.42 acre of trees may be cleared as part of this project. Construction is anticipated to occur between February 2022 and November 2022. Temporary lighting may be used during construction, but all lighting will be directed away from potential bat roosts. No permanent lighting will be added or changed

Award

Roads / Highways

$5,723,000.00

Public - State/Provincial

Paving, Site Work

144

8

4

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Castings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Waterway Construction and Equipment, Waterway Scour Protection, Riprap Scour Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
67
Bidding Soon
1,418
All Active Projects
620
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

January 16, 2023

img_map_placeholder

State Hwy 7, North Vernon, IN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Intersection Improvements and Small Structure Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.