BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Reno, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reno Consolidated 19-01 Sutro Street, 1st Street, Lake Street and State Street Project (Labor Commission Identification Number: Pwp-wa-2019-189). The major work items include: Removal and placement of plantmix bituminous surface and aggregate base, coldmilling, placement of concrete sidewalks, driveways and curb cut ramps, utility adjustments, storm drain improvements, roadway excavation, traffic signal modifications, placement of permanent pavement markings, placement of traffic signs and temporary traffic control. For questions about the bid process, please contact Evan Speight [ph: (775) 335-1844; fax: (775) 348-3230; email: espeight@rtcwashoe.com]. For technical questions about the plans and specifications, please contact Judy Tortelli [ph: (775) 335-1824; email: jtortelli@rtcwashoe.com] or Chad Anson [ph: (775) 393-2040; email: chad.anson@c-agroup.com]. Every Bid shall be accompanied by a Surety Company Bid Bond, or by a Certified or Cashiers Check made payable to the Regional Transportation Commission in the amount of not less than five percent (5%) of the Bid, said amount to be forfeited to the RTC should the Bidder to whom the Contract is awarded fail to enter into a Contract in accordance with the Bid and other Contract Documents within ten (10) calendar days after award. Prevailing wage rates for Washoe County shall be posted on the work site and paid to all classifications of labor as required by the laws of the State of Nevada. The work to be performed under this Contract shall be commenced by the successful Bidder after the executed Contract Documents have been submitted, and within five (5) calendar days of the commencement date set forth in the Notice to Proceed. The work, including any and all alternates and options, shall be completed within seventy (70) working days after the commencement date set forth in the Notice to Proceed. The right is reserved to reject any and all Bids or accept the Bid that is deemed by the RTC to be in the best interest of the RTC. The RTC reserves the right to accept or reject any or all alternates or options or any combination thereof. The RTC also reserves the right to waive any irregularities and/or informalities in the submitted Bid Forms. Engineers Opinion of Probable Cost: $2,700,000 to $3,100,000.

Award

Roads / Highways

$3,768,007.00

Public - City

Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
14
Bidding Soon
226
All Active Projects
92
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2019

August 12, 2019

img_map_placeholder

Multiple Locations, Reno, NV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.