Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 11, 2026 at 7:00 PM

Updated November 15, 2026

Site work, paving and new construction of a mixed-use development in South San Francisco, California. Completed plans call for the construction of a 10,150-square-foot, two-story above grade, 14-space fire / police facility; for site work for a fire / police facility; and 10,150-square-foot, two-story above grade fire / police facility.

Overall work under this Contract shall include all labor, materials, equipment, supervision, coordination efforts, permitting costs, certificate costs, services, filing fees, testing costs, security, insurance and all other associated or related items specified herein that are necessary and are required to complete the Work. Work includes all demolition required to complete the project regardless of whether the demolition is specifically indicated on the drawings. Elements shall include, but not be limited to the following Demolition and removal of all existing site structures including but not limited to all fencing, gates, walls, stairways, railings, and free-standing items (e.g. bollards, signs, sign posts, light poles, light pole bases, canopies, etc.) Demolition, removal, and disposal of all topsoil, stumps, roots and organic materials, removal of existing sidewalks, drives, curbs, pavement, etc. Removal/Abandonment of existing above-ground and underground utilities and associated structures. It shall be the responsibility of the Contractor to accurately locate all facilities and to determine their extent. If such facilities obstruct the progress of the work and are not indicated to be removed or relocated, they shall be removed or relocated only as directed by the Owner. Installation and maintenance of soil erosion and sediment control measures. Removal from site and disposal of all excess and unusable material in accordance with applicable regulations. Transportation and disposal in an appropriately licensed landfill of all demolition debris not recycled or reused on-site. Project No. 00100509 New 10,150 square foot fire station to replace existing restaurant at 71 Camaritas Avenue. The new fire station will consist of a two-story office and living quarters building with a 3-bay apparatus garage, as well as public and secure parking. Question Deadline 10/30/2026 at 4:00 PM PT

GC Bidding

Fire / Police

$15,000,000.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
511
Active Projects
159
Bidding Soon
3,410
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2026

February 1, 2027

Project location map

71 Camaritas Ave, South San Francisco, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed