Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 26, 2019 at 8:00 PM
Updated December 17, 2024
Site work and paving for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of July 26, 2019 project has not been awarded yet. The Major Items of Work Are Approximately: 1 Lump Sum Mobilization; 691 Sq Ft Pavement Marking Removal; 1 Each Remove Footing; 4 Each Remove Curb Box; 17 Each Salvage Sign Type C; 1546 Lin Ft Remove Curb & Gutter; 200 Lin Ft Remove Concrete Encased Conduit; 46 Sq Yd Remove Concrete Driveway Pavement; 969 Sq Ft Remove Bituminous Walk; 10621 Sq Ft Remove Concrete Walk; 2 Each Remove Transite Handhole; 3330 Sq Ft Remove and Replace Bituminous Pavement; 2560 Sq Ft Salvage Brick Pavers; 10 Hour Street Sweeper (With Pickup Broom); 84 Lin Ft Integrant Curb Design B6; 45 Sq Yd Concrete Pavement 8.0"; 677 Each Drill & Grout Reinf Bar (Epoxy Coated); 5 Each Adjust Gate Valve; 5 Each Adjust Curb Stop; 21 Each Adjust Frame & Ring Casting; 12410 Sq Ft Concrete Walk; 1472 Lin Ft Concrete Curb & Gutter Design B624; 32 Lin Ft Concrete Curb Design Special; 554 Lin Ft Concrete Curb Design V; 1205 Sq Ft Truncated Domes; 1910 Sq Ft Install Brick Pavers; 2 Each Handhole; 200 Lin Ft 2" Non-metallic Conduit; 14 Each Adjust Handhole; 1 Lump Sum Traffic Control; 1 Lump Sum Alternate Pedestrian Route; 17 Each Install Sign Type C; 16 Each Install Sign Collar; 1 System Revise Signal System a; 1 System Revise Signal System B; 1 System Revise Signal System C; 1 System Revise Signal System D; 1 System Revise Signal System E; 1 System Revise Signal System F; 1 System Revise Signal System G; 1 System Revise Signal System H; 46 Each Storm Drain Inlet Protection; 10 Cu Yd Common Topsoil Borrow; 50 Each Site Restoration; 768 Sq Ft Crosswalk Pref Thermo Gr in;
Bid Results
Roads / Highways
$896,700.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2019
September 23, 2019
Multiple Locations, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Jul 02 2019
Minneapolis, MN
Bid Date: Jun 18 2019
Minneapolis, MN
Bid Date: Jun 11 2019
Minneapolis, MN
Bid Date: Jun 18 2019
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Jul 11 2019
Minneapolis, MN
Bid Date: Jun 05 2019
Minneapolis, MN
Bid Date: May 21 2019
Minneapolis, MN
Bid Date: Jul 12 2019
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Jul 12 2019
Minneapolis, MN
Bid Date: Jul 23 2019
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Aug 20 2019
Minneapolis, MN
Bid Date: Aug 08 2019
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed