Site work and renovation of a transportation facility in Grinnell, Iowa. Completed plans call for the renovation of a transportation facility; and for site work for a transportation facility.

The extent of the work involved is as follows: Fuel System Improvements including installation of a new Av Gas above ground fuel tank, Av Gas fuel dispenser, Jet A above ground fuel tank, Jet A fuel dispenser and removal of existing Underground Av Gas and Jet A Fuel tanks and existing Av Gas and Jet A Fuel dispensers at the Grinnell Regional Airport Proposals will be acted on by the City of Grinnell at a meeting to be held at City Hall at 520 Fourth Avenue, Grinnell, Iowa 50112, at 7:00 P.M. local time on July 15, 2019, or at such later time and place as may then be fixed. Contract Time: The work under the contract shall actively commence within ten (10) days upon issuance of the Notice to Proceed. Construction on the project shall start no sooner than August 18, 2019 and shall be completed by no later than November 23, 2019. All work shall not commence on the project until all materials needed for the project have been received. The airport is anticipated to be closed during this same time period due to a Runway Rehabilitation Project. It is anticipated that the airport will re-open to aircraft operations and fueling operation on November 24, 2019. This project is subject to liquidated damages as described within the project manual. Bid Security: Each proposal must be accompanied with a bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction and filed in an envelope separate from the one containing the proposal, made payable to: Treasurer, City of Grinnell. Said check or draft may be cashed or the bid bond declared forfeited by the Treasurer as liquidated damages in the event the successful bidder fails to enter into a Contract within ten (10) days and post bond satisfactory to the Owner insuring the faithful fulfillment of the Contract and maintenance of said improvements as required by law and the Specifications. The bid shall contain no condition except as provided in the specifications Award of Contract : Bidders shall not be permitted to withdraw their bids for a period of sixty (60) days after the date set for opening bids. The Owner reserves the right to reject any and all bids and to waive any informality in the bids received in the best interest of the Jurisdiction. Bonding Requirements: The successful bidder will be required to furnish a performance and payment bond in the amount equal to 100% of the contract price at the time of contract execution. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by City of Grinnell and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless City of Grinnell from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of 2 years from the date of final acceptance of the work under the Contract The City of Grinnell reserves the right to award the Contract at the time of said meeting or at such later time may then be fixed and to reject any or all bids and to waive technicalities and irregularities and to enter into such Contract as it shall deem to be for the best interests of said Owner.

Award

Transportation Terminals

$385,033.00

Public - City

Renovation, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Alternates, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire-Suppression Water Storage, Storage Tanks for Fire-Suppression Water, Underground Storage Tanks for Fire-Suppression Water
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Potable-Water Storage Tanks, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Gas Storage Tanks for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Facility Fuel Systems, Facility Fuel-Storage Tanks, Facility Underground Fuel-Oil, Storage Tanks
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Fuel Distribution Utilities, Fuel-Storage Tanks, Aviation Fuel-Storage Tanks, Compressed Gases Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
45
Bidding Soon
674
All Active Projects
274
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2019

August 18, 2019

img_map_placeholder

1607 West St, Grinnell, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Grinnell Regional Airport Fuel System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.