BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2019 at 8:00 PM

Updated May 2, 2025

Site work and paving for a mixed-use development in New Smyrna Beach, Florida. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

As of July 31 2019 there is an awarded bidder. UES Project No. 0430.1500148.0000 Sealed bid proposals for the furnishing of all labor, materials, services and equipment for the project entitled Improvements to Terminal Apron, and Apron/Taxilane for South Hangars at New Smyrna Beach Municipal Airport This project (if both bid schedules are awarded) includes removing approximately 2,900 square yards of existing asphalt and concrete pavement, constructing approx. 4,800 square yards of asphalt pavement, constructing approx. 7,200 square yards of concrete pavement, performing drainage improvements, grassing unpaved areas, marking the pavements, installing aircraft tie-down anchors, relocating taxiway edge lights, and installing airfield guidance signs. No proposals may be withdrawn for a period of ninety (90) days after the scheduled time for receipt of proposals. The City of New Smyrna Beach reserves the rights to waive any informalities in or reject any and all bid proposals, or to re-advertise for bid proposals. Bid proposals must be submitted as set forth in the "Instructions to Bidders" and in the "Proposal Requirements and Conditions" included in the Contract Documents. It is required that the bid security be enclosed in a separate envelope, as provided in the Instructions to Bidders. The award of this Contract will be contingent upon the concurrence of the Florida Department of Transportation. If both Bid Schedules 1 and 2 are awarded, the scheduled contract (construction) time shall be 180 calendar days. If only Bid Schedule 1 is awarded or only Bid Sch. 2 is awarded, the scheduled contract time shall be 120 calendar days. Regardless, the contract time shall commence on the effective date of the Notice to Proceed (NTP), which will be issued after all permits have been obtained.

Award

Transportation Terminals

$1,256,676.00

Public - City

Paving, Site Work

26

12

2

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
90
Bidding Soon
1,831
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2019

August 21, 2019

Project location map

602 Skyline Dr, New Smyrna Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.