BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Site work for a pipeline in Washington, Utah. Conceptual plans call for site work for a pipeline.

Plans call to construct 140-mile buried pipeline would carry water from Lake Powell to Washington and Kane counties aided by five pump stations and six hydroelectric facilities providing a portion of the energy the stations need. The pipeline would be capable of transporting 82,249 acres feet of water per year to Washington County and 4,000 acres feet of water per year to Kane County. As of April 7, 2024, this project is currently in the environmental review process. A design firm has not been selected as of yet. A firm timeline for construction has not been established.

Conceptual

Pipeline

$1,800,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
11
Bidding Soon
146
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

Project location map

Multiple Locations, Washington, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.