BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 30, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a road / highway in Gilbert, Arizona. Design plans call for site work for a road / highway.

UPDATE:https://www.chandleraz.gov/sites/default/files/2023-2032_Final_CIP.pdf Arterial Street improvements utilizing impact fees are needed to provide for increasing traffic volumes. Improvements to Lindsay Road will consist of four traffic lanes, bike lanes, sidewalks, curbs and gutters, street lighting, turn lanes, traffic signals, storm drainage, landscaping, right-of-way (ROW) acquisition, and utility relocation. This project will extend Lindsay Road improvements from Ocotillo Road to Hunt Highway. Operations and maintenance funding for utilities, landscape maintenance and future pavement repairs are also included with this project. Design will be partially reimbursed by the Regional Transportation Sales Tax programmed in Federal Fiscal Year (FFY) 2020 ($1.214M); ROW in FFY 2022 ($0.994M) and construction in FFY 2023 ($5.243M). Funding for utilities, landscape maintenance, and future pavement repairs are also included with this project. _________________________________________________________ Arterial Street improvements utilizing impact fees are needed to provide for increasing traffic volumes. Improvements to Lindsay Road will consist of four traffic lanes, bike lanes, sidewalks, curbs and gutters, street lighting, turn lanes, traffic signals, storm drainage, landscaping, right-of-way (ROW) acquisition, and utility relocation. This project will extend Lindsay Road improvements from Ocotillo Road to Hunt Highway. Operations and maintenance funding for utilities, landscape maintenance and future pavement repairs are also included with this project. Design will be partially reimbursed by the Regional Transportation Sales Tax programmed in Federal Fiscal Year (FFY) 2020 ($1.214M); ROW in FFY 2022 ($0.994M) and construction in FFY 2023 ($5.243M). Funding for utilities, landscape maintenance, and future pavement repairs are also included with this project. As of October 15, 2021, this project is currently in the FY 2021-2030 CIP. Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$17,720,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
0
Bidding Soon
625
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

Project location map

S Lindsay Rd, Gilbert, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.