BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Mobile, Alabama. Completed plans call for site work for a water / sewer project.

This Requisition solicits proposals to furnish labor, materials, equipment, and supervision necessary to partially remove fifty feet of existing deteriorated, and damaged sheet pile bulkhead and to install a new sheet pile bulkhead. It also includes the removing and replacing the inboard fender system at the No. 1 Barge Loader at the McDuffie Terminal in Mobile, Alabama as per contract drawings and specifications. The Alabama Port Authority will make the final determination of the start date. All work is to be coordinated with ASPA McDuffie Terminal management in order for it not to interfere with facility operations. Work will be in accordance with all the requirements stated herein, attached scope of work, drawings and specifications, Insurance Requirements, and applicable State of Alabama Laws. The work is marine structural in nature and consists principally of providing insurance, bonds, labor, materials, equipment, and supervision necessary for the work as indicated in this specification and contract documents. The project site is located at the Alabama Port Authority McDuffie Terminal in Mobile, Alabama All Contractors submitting bids are to carefully examine the site of the proposed work and thoroughly review the contract requirements prior to submission of a bid proposal. Each Bidder shall satisfy himself as to the character, quality, and quantities of work to be performed, and as to the requirements of the proposed contract. The submission of a proposal shall be proof that the bidding Contractor has made such examination and is satisfied as to the conditions to be encountered in performing the work and as to the requirements of the proposed contract. The work performed under this contract shall not commenced until Contractor has submitted bonds and insurance in an acceptable form. The Contractor will be required to complete the work within 90 days after receipt of a "Notice to Proceed" Work will start not later than 10 calendar days after receipt of "Notice to Proceed". ASPA intent is that work hours will be during normal day light hours. The Contractor shall comply with all Federal and State laws, local ordinances and regulations, and all orders and decrees of bodies or tribunals having any jurisdiction or authority, which in any manner affect those engaged or employed on the work, or which in any way affect the conduct of the work. The contractor is to submit a construction schedule to include demolition and installation prior to the start of the project. The schedule is to include nominal time for field adjustments for fabricated items. The Contractor shall place a competent superintendent on the Project who shall have experience in the work being performed under the Contract. The assigned superintendent shall have the responsibility for the day-to-day operations of the work and shall remain on the Project site while the work under the Contract is being performed. Effective October 1, 2011, the Beason-Hammon Alabama Taxpayer and Citizen Protection Act ("the Act") requires that any business entity contracting with or providing any grant or incentives to the state, including the Alabama State Port Authority, certify compliance with the Act. All Bidders must certify such compliance by executing the enclosed Certificate of Compliance and returning it to the Alabama State Port Authority with your bid package along with proof of the contractor's enrollment in the e-verify program. Bid proposals must be submitted in a sealed envelope with the bidders name, Contractors License number, the project name, and the time and date of the bid opening shown on the outside. Authority reserves the right to refuse to issue a proposal form or a contract to a prospective bidder for any of the following reasons: a) Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contract in force with the Authority. b) Contractor default under previous Contract with the Authority. c) Proposal withdrawal or Bid Bond forfeiture on previous project with the Authority. d) Unsatisfactory work on previous contract with the Authority. Any questions regarding the procurement should be directed to Mr. William V. Boulton, P.E., Project Manager at phone number (251) 441-8160, or email, wboulton@asdd.com Authority may make such investigations as deemed necessary to determine the ability of the bidder to perform the work, and the bidder shall furnish all such information and data for this purpose as the Authority may request. The Authority reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the Authority that such bidder is properly qualified to carry out the obligations of the Contract. The right is reserved, as the interest of the Alabama State Port Authority may require, to reject any and all bids and to waive informalities in bids received.

Post-Bid

Water / Sewer

$300,000.00

Public - State/Provincial

Site Work

4

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
37
Bidding Soon
486
All Active Projects
228
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2019

August 22, 2019

img_map_placeholder

1901 Ezra Trice Blvd, Mobile, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.