EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 13, 2019 at 8:00 PM

Updated October 1, 2024

New construction of an educational facility in San Diego, California. Completed plans call for the construction of a 32,341-square-foot, two-story above grade educational facility.

Project includes King Chavez Primary, Arts and Athletics Academy Whole Site Modernization (WSM) Project and King Chavez Primary, Arts and Athletics Academy Joint Use Field (JUF) Project Estimated Construction (Hard Cost) Budget for King Chavez WSM Project: $17,970,623 Estimated Construction (Hard Cost) Budget for King Chavez JUF Project: $2,000,000 Anticipated Duration of the Projects: Twenty-Nine (29) months The King Chavez Project is targeted for construction beginning on or about September 13, 2019, and upon issuance of a written Notice to Proceed (NTP). Questions regarding this RFP must be in writing and directed only to Ashley Mains at amains@sandi.net by the date indicated in the RFP Schedule. CONTRACTORS WITH QUESTIONS OR COMMENTS ABOUT THIS RFP OR THE PROJECT SHOULD NOT CONTACT ANY OTHER DISTRICT REPRESENTATIVE, BOARD MEMBER, CONSULTANT, EMPLOYEE, OR PERSON. ATTEMPTS BY A CONTRACTOR TO CONTACT ANY OTHER PERSON MAY RESULT IN DISQUALIFICATION OF THAT FIRM. Deadline for Contractors to submit RFI questions regarding this RFP 2:00 PM, June 26, 2019 Deadline for MEP and Non-MEP Subcontractors to complete and submit Prequalification Application for King Chavez WSM Project 2:00 PM, June 26, 2019 District to provide all contractors with list of all prequalified Subcontractors for King Chavez WSM Project July 3, 2019

Award

Educational

$7,000,000.00

Public - City

New Construction

238

6

19

3

Subscribe For Documents

496 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Membrane Roofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Fireplaces and Stoves
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
58
Bidding Soon
763
All Active Projects
362
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2019

August 1, 2019

img_map_placeholder

415 31st St, San Diego, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

King Chavez Primary Academy

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.