BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2019 at 7:00 PM

Updated February 25, 2025

Site work for a water / sewer project in Louisville, Kentucky. Completed plans call for site work for a water / sewer project.

Description and location of Project: The scope of the project is as follows: This Contract provides for the installation of approximately 21,000 linear feet of cured-in-place pipe in sanitary mains, ranging in diameter from 8 to 18 inches, as well as approximately 450 associated laterals to be lined from the main to the property line using cured-in-place pipe. This project also includes replacement of approximately 530 sanitary manhole castings including chimney seals, approximately 20 manhole frame realigns, and approximately 100 manhole casting raises, as well as approximately 900 vertical feet of epoxy lining. The project includes all erosion control, ground restoration and appurtenant work as described in the bid proposal. The project site is located in central Jefferson County, approximately bounded on the north and south by I-264 and Buechel Branch, and approximately bounded on the west and east by Bardstown Road and Breckinridge Lane. All work shall be done in accordance to MSD's Standard Specifications. The Project Manager for this Invitation to Bid is Chris Gregory. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's Project Manager, Chris Gregory E-mail: chris.gregory@louisvillemsd.org. Questions received less than 10 days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, Angela Akridge, P.E. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's Project Manager, Chris Gregory. MSD Interim Supplier Diversity Policy and Guidelines for this project is as follows: 15% MBE and 6% WBE participation is required for this project IF THE ENGINEERS CONSTRUCTION COST ESTIMATE IS 50,000 OR MORE, the Minority Business Enterprise and Woman Business Enterprise (MBE/WBE) participation goals shall be applicable to all contracts and comply with MSDs Interim Supplier Diversity Policy and Guidelines (Interim Policy). The Interim Policy is considered as one of the elements of responsiveness in a bid. Bidders must subcontract at least 15.0% of the total amount of the Contract Bid price to a certified MBE and 6.0% to a certified WBE, or if the Contractor is unable to meet the goals, must demonstrate adequate GOOD FAITH EFFORTS in accordance with the Interim Policy. (see MSD Construction Related MBE/WBE Documents and Forms at Budget I.D. No. H16074 The Bidder awarded the contract shall complete this project within 730 calendar days. The project site is located in central Jefferson County, approximately bounded on the north and south by I-264 and Buechel Branch, and approximately bounded on the west and east by Bardstown Road and Breckinridge Lane.

Award

Water / Sewer

$2,980,279.00

Public - County

Site Work

22

1

17

12

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
124
Bidding Soon
1,689
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2019

November 25, 2019

Project location map

Multiple Locations, Louisville, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.