Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 5, 2019 at 8:00 PM
Updated January 25, 2024
Site work and paving for a road / highway in Camarillo, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Potrero Road Bike Lanes - Phase I DBE Goal Percentage: 13% Project Duration: 50 Work Days Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10% pavement widening of Potrero Road including traffic control & construction signing, water pollution prevention, root barrier, PCC drain with grates & frame, light rock splash pad, percolation trench, cast- in place catch basin, air placed concrete with wire mesh, PCC driveway approach reconstruction, road shoulder slope & ditch regrading, AC pavement widening, miscellaneous AC paving, AC curb, PMB shoulder backing, micro milling, road surface preparation & crack sealing, Type II emulsion- aggregate slurry, pavement delineation & striping & appurtenant work
Award
Roads / Highways
$1,028,791.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
