BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Marion, North Carolina. Completed plans call for site work for a bridge / tunnel; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Pursuant to NC General Statues 143-129, sealed bids will be received by the City of Marion for the furnishing of all materials, labor, equipment and construction of the Lincoln Avenue Culvert Replacement, consisting of one contract having the following principal items: Replacement of the Lincoln Avenue Culvert consists of construction of approximately 60 feet of 10.5x12 RCBC. Additionally, this will require other drainage, curb & gutter, paving, and waterline relocation. A Bid Security in the amount of five percent (5%) of the proposed overall bid amount must accompany each proposal in order to be considered. The Bid security may be in the form of cash, a certified check or bank draft payable to the City of Marion, a Bid Bond executed by the Bidder or an acceptable Surety Agency licensed to conduct business in North Carolina. No Bid may be withdrawn for a period of ninety (90) days from the date of bid opening except as may be allowed under North Carolina General Statutes. Contractors must be pre-qualified as a Bidder or PO Prime Contractor prior to bidding on this Project. Bidders shall submit all questions during the advertisement period to Ricky Tipton, PE, PLS, (rtipton@gfnet.com). Questions will be answered via Addenda as outlined in these Contract Documents. Each proposal shall be accompanied by a certified check or bid bond in the amount of not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instruction to Bidders. The Owner reserves the right to reject all bids, to waive formalities, to reject nonconforming, nonresponsive, or conditional bids. The BIDDER to whom a contract may be awarded shall fully comply with the requirements of all North Carolina General Statutes governing the practice of general contracting. No BIDDER may withdraw his BID within 90 calendar days after the actual date of the opening thereof.

Award

Bridges / Tunnels

$577,720.00

Public - City

Paving, Site Work

28

8

4

11

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
116
Bidding Soon
1,657
All Active Projects
746
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 4, 2021

July 5, 2021

August 16, 2021

img_map_placeholder

Lincoln Ave, Marion, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.