Published January 16, 2020 at 7:00 PM
Updated May 21, 2026
Site work and paving for a civil project in Petrified For, Arizona. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
This project will be advertised as a total small business set-aside. This project in includes reconstruction of 14.52 miles of the Main Park road, the installation of multi-cell box culverts in three different locations, concrete curb, and installation of 120 culverts located within Petrified Forest National Park. The major work elements include cold recycle asphalt base course using the existing pavement, subgrade preparation, finish grading, asphalt concrete paving, concrete curb, replacement of CMP culverts, and riprap placement. Significant Items for Schedule A Include: 74,000 SQYD of cold in-place recycled asphalt base course 6" depth, 9,800 TONS of hot asphalt concrete paving, 810 LNFT of 24 inch of Dual wall HDPE culvert, 235 of LNFT 36 inch of Dual wall HDPE culvert, 600 LNFT of 24 inch culvert pipe lining, 170 LNFT of 8 feet span by 3 feet rise precast reinforced concrete box culvert, 600 CUYD of roadway excavation, 6,000 CUYD of sub excavation, 2,290 LNFT of 12 inch colored concrete curb, and 350 LNFT of Guardrail system MGS, type 2 with steel posts and terminal sections. Significant Items for Option X Include: 87,000 SQYD of cold in-place recycled asphalt base course 6" depth, 10,500 TONS of hot asphalt concrete paving, 900 LNFT of 24 inch of Dual wall HDPE culvert, 82 LNFT of 36 inch of Dual wall HDPE culvert, 1,800 LNFT of 24 inch culvert pipe lining, 240 LNFT of 36 inch culvert pipe lining, 900 CUYD of roadway excavation, 4,500 CUYD of sub excavation, and 7,000 LNFT of 12 inch colored concrete curb. Significant Items for Option Y Include: 54,000 SQYD of cold in-place recycled asphalt base course 6" depth, 8,700 TONS of hot asphalt concrete paving, 800 LNFT of 24 inch of Dual wall HDPE culvert, 50 LNFT of 36 inch of Dual wall HDPE culvert, 330 LNFT of 24 inch culvert pipe lining, 16,500 CUYD of sub excavation, and 480 LNFT of 12 inch colored concrete curb. Estimated total cost for Schedule A, Option X, and Option Y is $10,000,000 to $12,000,000. Construction Duration: November, 2019 through July, 2020. Anticipated advertisement in October, 2019. Anticipated bid opening in November, 2019. Anticipated award in November, 2019. The method of contractor selection has not been determined at this time. REQUISITION/PURCHASE REQUEST NO - HFLCEO190310PR Bridge Nos. 8430 007P, 8430 008P and 8430 009P
Award
Bridges / Tunnels
$9,668,134.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2019
December 12, 2019
Multiple Locations, Petrified For, AZ
Related To This Project
Petrified For, AZ
Bid Date: Jul 07 2025
Yuma Proving Ground, AZ
Bid Date: Sep 30 2020
Sierra Vista, AZ
Bid Date: Aug 16 2021
Golden Valley, AZ
Bid Date: Jun 25 2021
Cibola, AZ
Bid Date: Jun 08 2021
Flower Pot, AZ
Bid Date: Feb 26 2021
Glendale, AZ
Bid Date: Apr 27 2026
Peoria, AZ
--
Buckeye, AZ
Bid Date: May 21 2026
Phoenix, AZ
Bid Date: Apr 27 2026
Corona de Tucson, AZ
Bid Date: May 26 2026
Glendale, AZ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.