BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 16, 2020 at 7:00 PM

Updated May 21, 2026

Site work and paving for a civil project in Petrified For, Arizona. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

This project will be advertised as a total small business set-aside. This project in includes reconstruction of 14.52 miles of the Main Park road, the installation of multi-cell box culverts in three different locations, concrete curb, and installation of 120 culverts located within Petrified Forest National Park. The major work elements include cold recycle asphalt base course using the existing pavement, subgrade preparation, finish grading, asphalt concrete paving, concrete curb, replacement of CMP culverts, and riprap placement. Significant Items for Schedule A Include: 74,000 SQYD of cold in-place recycled asphalt base course 6" depth, 9,800 TONS of hot asphalt concrete paving, 810 LNFT of 24 inch of Dual wall HDPE culvert, 235 of LNFT 36 inch of Dual wall HDPE culvert, 600 LNFT of 24 inch culvert pipe lining, 170 LNFT of 8 feet span by 3 feet rise precast reinforced concrete box culvert, 600 CUYD of roadway excavation, 6,000 CUYD of sub excavation, 2,290 LNFT of 12 inch colored concrete curb, and 350 LNFT of Guardrail system MGS, type 2 with steel posts and terminal sections. Significant Items for Option X Include: 87,000 SQYD of cold in-place recycled asphalt base course 6" depth, 10,500 TONS of hot asphalt concrete paving, 900 LNFT of 24 inch of Dual wall HDPE culvert, 82 LNFT of 36 inch of Dual wall HDPE culvert, 1,800 LNFT of 24 inch culvert pipe lining, 240 LNFT of 36 inch culvert pipe lining, 900 CUYD of roadway excavation, 4,500 CUYD of sub excavation, and 7,000 LNFT of 12 inch colored concrete curb. Significant Items for Option Y Include: 54,000 SQYD of cold in-place recycled asphalt base course 6" depth, 8,700 TONS of hot asphalt concrete paving, 800 LNFT of 24 inch of Dual wall HDPE culvert, 50 LNFT of 36 inch of Dual wall HDPE culvert, 330 LNFT of 24 inch culvert pipe lining, 16,500 CUYD of sub excavation, and 480 LNFT of 12 inch colored concrete curb. Estimated total cost for Schedule A, Option X, and Option Y is $10,000,000 to $12,000,000. Construction Duration: November, 2019 through July, 2020. Anticipated advertisement in October, 2019. Anticipated bid opening in November, 2019. Anticipated award in November, 2019. The method of contractor selection has not been determined at this time. REQUISITION/PURCHASE REQUEST NO - HFLCEO190310PR Bridge Nos. 8430 007P, 8430 008P and 8430 009P

Award

Bridges / Tunnels

$9,668,134.00

Public - Federal

Paving, Site Work

190

1

10

10

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
4
Bidding Soon
153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2019

December 12, 2019

Project location map

Multiple Locations, Petrified For, AZ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.