BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2019 at 8:00 PM

Updated November 14, 2023

Renovation of a clubhouse / community center in Sarasota, Florida. Completed plans call for the renovation of a clubhouse / community center.

Contractor shall provide a 400kW rated generator to power Robert L. Taylor Community Center during a 500 year storm event, with the following requirements: 480V Standby, power control panel, local and remote annunciator, battery charger, batteries, battery rack, battery cables, jacket water heater, internal exhaust system, space heater generator, and minimum 2 year warranty. Contractor shall also provide the HVHZ enclosure, 72 hour fuel tank, structural engineering, electrical engineering, electrical contracting, rigging and concrete work.

Award

Clubhouse / Community Centers

$317,953.00

Public - City

Renovation

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
96
Bidding Soon
1,991
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2019

September 9, 2019

Project location map

1845 34th St, Sarasota, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.