BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2019 at 8:00 PM

Updated September 15, 2023

Site work and new construction of an educational facility in Wilmington, North Carolina. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

SCO#16-15505-02-B Audio Visual Package: 16-15505-02C Fully complete all work within 775 consecutive calendar days. The CM and Owner reserve the right to add prequalified bidders and/or reject any and all proposals. In accordance with GS 133-3, Section 64 the following preferred brands are being considered: Sony projectors, Extron touchpanels, switcher/scalers, matrix switchers, and NAV AVoIP solution, Mersive collaboration system, Spectrum Furniture lecterns, Vaddio cameras and camera control, Echo360 capture solution, Biamp DSP systems, LG for all displays 65" and below (excluding video wall), Chief mounts. All questions should be submitted via e-mail to jlovelace@balfourbeattyus.com Project value reflects total project Estimate

Post-Bid

Educational

$51,000,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
50
Bidding Soon
601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2019

October 7, 2019

Project location map

5150 Lionfish Dr, Wilmington, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.