BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

This project's work is generally described of consisting of the installation of approximately 9,070 linear feet of 8", 12", and 24" gravity sanitary sewers and sanitary sewer service leads. This work is to take place along Kansas Street, North Locust Drive, South Locust Drive, Ash Street, Pecan Street, and Cedar Street within the southern region of the Fort Bend County Freshwater Supply District No. 1. Work also includes the decommissioning of an existing lift station and forcemain. A cashier's check, certified check, or bid bond payable to the Fort Bend County Freshwater Supply District No. 1 in the amount of five percent (5%) of the total amount bid must accompany each bid. The successful bidder must furnish a payment and performance bond acceptable to owner. This contract is contingent upon release of funds from the Texas Water Development Board. Any contract or contracts awarded under this Invitation for Bids are expected to be funded in part by a loan from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or employees is or will be a party to this Invitation for Bids or any resulting contract. The Fort Bend County Freshwater Supply District No. 1 has the right to reject any and all bids. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of P.L. 113-76 Consolidated Appropriations Act, 2014. Additionally, Davis-Bacon and Related Acts (DBRA) apply to contractors and subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, alteration or repair of public buildings or public works. Equal Opportunity in Employment - All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sex, religion, age or handicap. The contractor shall carry out applicable requirements of 40 CFR Part 33 in the award and administration of contracts awarded under Texas Water Development Board financial assistance agreements. Failure by the contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. Deadline for asking questions or requesting clarifications is August 7th at 5pm.

Bid Results

Water / Sewer

$2,405,290.00

Public - County

Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
59
Bidding Soon
2,739
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2019

October 11, 2019

img_map_placeholder

To Be Determined, Houston, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.