BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Baker Lake, Nunavut. Completed plans call for the construction of a 13,000-square-foot, two-story above grade municipal facility; for site work for a municipal facility; and 350-square-foot, one-story above grade municipal facility.

Construction of a new office building in the community of Baker Lake to accommodate the consolidation of Qulliq Energy Corporation's (QEC) business activities in its headquarters, currently spread over three separate properties. Completion of the project is set based upon a lease termination date for one of the three leased office properties. Amalgamation of the three separate offices into a single space is expected to provide QEC operational efficiencies, as well as provide QEC and the community of Baker Lake a physically identifiable QEC Head Office presence that currently does not exist. The location of the new office building will be on Lot 4, Block 50, Baker Lake, a green field site. This lot is adjacent the largest of the currently leased QEC offices. The new office building will have two storeys with a footprint of approximately 665 square meters per storey, plus an approximately 36-square-metre single-storey mechanical room. The building has been designed as a highly energy efficient facility with an assumed 40-year life cycle. The building has been designed to maximize natural daylighting, capable of withstanding the extreme Arctic environment found in Baker Lake.

Award

Municipal

$13,550,913.00

Public - State/Provincial

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

115 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
1
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2020

December 28, 2020

img_map_placeholder

Lot 4, Block 50,, Baker Lake, NU


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.