BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a civil project in Peoria, Arizona. Conceptual plans call for site work for a road / highway; and water / sewer project.

This project provides for the coordination with adjacent property owners, public involvement, design, construction, and construction administration for the repair and rehabilitation of the existing Olive Avenue storm drain outfall located at the southeast corner of Olive Avenue and east of 99th Avenue. The main focus will be to remove the existing concrete grass pavers which are in disrepair, reline the channel with 6-inch thick shotcrete that will be embedded with rebar, and provide maintenance access. Additional improvements will include: adding a guardrail along Olive Avenue for safety purposes and adding bank protection at the existing downstream headwall located at Olive Avenue. This project may also require processing of utility company (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc.) design and construction agreements, development and intergovernmental agreements. The project is included in the city's 2022-2031 Capital Improvement Program (CIP). As August 2, 2021, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,127,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
53
Bidding Soon
1,229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

Project location map

99th Ave & Olive Ave, Peoria, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.