BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 29, 2023 at 7:00 PM

Updated January 29, 2024

New construction and renovation of an educational facility in Ledyard, Connecticut. Design plans call for the renovation of a educational facility; and for the construction of a 33,000-square-foot educational facility.

As of November 30, 2023, a developer has been awarded. A design firm has been selected and this project is in the design phase. Design firm information has not been determined. It is anticipated construction will start in summer 2024. *The closed solicitation has been included below for reference: The Town of Groton is soliciting proposals from qualified and experienced development teams that best serve the economic and community development interests of the Town. The site, located at 120 West Street (property ID 168807695041 E), is owned by the Town of Groton and also located within the City of Groton political subdivision. The Colonel Ledyard building is 20,378 square feet and sits on 8.32 +/- acres of land. The Town has been active in the marketing and redevelopment process. Questions regarding this RFP should be directed to ecardillo@groton-ct.gov no later than 12:00 P.M. on Friday, September 13, 2019. The Town of Groton (Town) reserves the right to accept or reject any and all proposals in whole or in part, to waive any technical defects, irregularities, and omissions, and to give consideration to past performance of the prospective respondents where the interests of the Town will be best served. The Town reserves the right to directly negotiate with any entity who submits a proposal in response to this RFP and to award a contract based upon those negotiations alone. The Town reserves the right to request interviews of developers, discuss all project details, and to select and negotiate a preferred development proposal that is in the best interest of the Town prior to final award. The method of contractor selection has not been determined at this time.

Design

Educational

$10,000,000.00

Public - City

New Construction, Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
675
Active Projects
372
Bidding Soon
4,542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

Project location map

740 Colonel Ledyard Hwy, Ledyard, CT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.