Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Issaquah, Washington. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and bridge / tunnel.
The work to be performed pro-vides for the improvement of pedestrian access along Newport Way NW at th.e intersection of the future Ring County trail-head parking lot entrance. Work includes but is not limited to road-way excavation and tree removal for a cement concrete raised inter-section, curb and gutter, ADA corn-pliant, landings, rectangular rapid. flash beacon (RRFB), pedestrian illumination and service cabinet, utility adjustments, empty conduit franchise utility trench, and sig-nage and channelization. Additional work includes con-struction of foundations and installation of a prefabricated pedestrian, bridge crossing Anti Aircraft Creek (AAC), bridge approaches, high-flow bypass inlet structure relocation, landscaping and stream buffer restoration of AA.C, and adjusting of existing utilities as needed. No bidder may withdraw their bid after the time announced for the opening, or before the award and execution of the contract, unless the award is delayed for a period exceeding sixty-five (65) days. Proposals shall be on forms included in the contract docu-ments an.d shall be accompanied by a certified check or bid bond (with an authorized surety com-pany as surety), made payable to the City of Issaquah, in an amount not less than 5% of the amount of the bid. Questions regarding this hid may be directed to the City of Issaquah Project Manager, Isabel Diaz at (425) 837-3415 or isabeld@ issaquahwa. gov. We reserve the right to waive any irregularities or inthrmali-ties and to reject any or all bids and to award this Contract to a single bidder based on the lowest responsible bid for aggregate total of both schedules.
Award
Roads / Highways
$995,995.00
Public - City
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 26, 2022
August 26, 2022
Newport Way NW, Issaquah, WA
Related To This Project
Issaquah, WA
--
Issaquah, WA
--
Issaquah, WA
Bid Date: Aug 02 2022
Issaquah, WA
--
Issaquah, WA
--
Issaquah, WA
Bid Date: Aug 18 2022
Issaquah, WA
Bid Date: Jun 22 2022
Issaquah, WA
--
Issaquah, WA
Bid Date: Jul 27 2022
Issaquah, WA
Bid Date: Jul 20 2022
Issaquah, WA
Bid Date: Feb 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.