Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Denver, Colorado. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Project consists of widening 56th Avenue from Peoria Street to Peña Boulevard to a four-lane typical section while establishing the footprint for an ultimate six-lane typical section. The Project also includes constructing a multi-use path along the north side of 56th Avenue, including connections to the neighborhood bike lanes and the trail system at the Rocky Mountain Arsenal National Wildlife Refuge. The four-lane roadway widening of 56th Avenue should be designed to minimize rework when the six-lane section is constructed in the future. Preparing for the ultimate six-lane section includes locating the median, curb and gutter, multi-use path, drainage, signage, lighting, signals, utilities, and other elements in their ultimate locations. The Design-Build Project, funded by the Elevate Denver Bond Program, consists of widening 56th Avenue from Peoria Street to Peña Boulevard to a four-lane typical section while establishing the footprint for an ultimate sixlane typical section. The Project also includes constructing a multi-use path along the north side of 56th Avenue, including connections to the neighborhood bike lanes and the trail system at the Rocky Mountain Arsenal National Wildlife Refuge. Also included are Uvalda tributary channel improvements, beginning at the northern 56th Avenue right-of-way line and extending upstream one to three blocks. The four-lane roadway widening of 56th Avenue will include medians and 5 traffic signals and should be designed to minimize rework when the six-lane section is constructed in the future. Preparing for the ultimate six-lane section includes locating the median, curb and gutter, multi-use path, drainage, signage, lighting, signals, utilities, and other elements in their final locations. Additionally, the path and greenspace on the south side of the roadway is not able to be revised in the roadway widening efforts. Schedule is of critical importance to the City. The anticipated completion deadline for the Project is calendar year 2023. The work for this contract consists of design and construction of the Project, including roadway, urban design, landscaping and medians, ADA compliance, traffic signals, drainage, tributary channel improvements, geotechnical, utility relocation, environmental, public outreach, and all other final design and construction features
Final Planning
Roads / Highways
$27,000,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 8, 2021
May 10, 2021
E 56th Ave, Denver, CO
Related To This Project
Denver, CO
Bid Date: Dec 30 2021
Denver, CO
--
Denver, CO
Bid Date: Apr 28 2022
Denver, CO
Bid Date: Sep 12 2019
Denver, CO
Bid Date: May 16 2019
Denver, CO
Bid Date: Jun 25 2020
Denver, CO
Bid Date: Jul 24 2020
Denver, CO
Bid Date: Aug 15 2022
Denver, CO
--
Denver, CO
--
Denver, CO
Bid Date: Aug 28 2018
Denver, CO
Bid Date: Dec 14 2018
Denver, CO
Bid Date: Mar 17 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.