BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Denver, Colorado. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project consists of widening 56th Avenue from Peoria Street to Peña Boulevard to a four-lane typical section while establishing the footprint for an ultimate six-lane typical section. The Project also includes constructing a multi-use path along the north side of 56th Avenue, including connections to the neighborhood bike lanes and the trail system at the Rocky Mountain Arsenal National Wildlife Refuge. The four-lane roadway widening of 56th Avenue should be designed to minimize rework when the six-lane section is constructed in the future. Preparing for the ultimate six-lane section includes locating the median, curb and gutter, multi-use path, drainage, signage, lighting, signals, utilities, and other elements in their ultimate locations. The Design-Build Project, funded by the Elevate Denver Bond Program, consists of widening 56th Avenue from Peoria Street to Peña Boulevard to a four-lane typical section while establishing the footprint for an ultimate sixlane typical section. The Project also includes constructing a multi-use path along the north side of 56th Avenue, including connections to the neighborhood bike lanes and the trail system at the Rocky Mountain Arsenal National Wildlife Refuge. Also included are Uvalda tributary channel improvements, beginning at the northern 56th Avenue right-of-way line and extending upstream one to three blocks. The four-lane roadway widening of 56th Avenue will include medians and 5 traffic signals and should be designed to minimize rework when the six-lane section is constructed in the future. Preparing for the ultimate six-lane section includes locating the median, curb and gutter, multi-use path, drainage, signage, lighting, signals, utilities, and other elements in their final locations. Additionally, the path and greenspace on the south side of the roadway is not able to be revised in the roadway widening efforts. Schedule is of critical importance to the City. The anticipated completion deadline for the Project is calendar year 2023. The work for this contract consists of design and construction of the Project, including roadway, urban design, landscaping and medians, ADA compliance, traffic signals, drainage, tributary channel improvements, geotechnical, utility relocation, environmental, public outreach, and all other final design and construction features

Final Planning

Roads / Highways

$27,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
110
Bidding Soon
1,642
All Active Projects
688
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 8, 2021

May 10, 2021

January 1, 2023

img_map_placeholder

E 56th Ave, Denver, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.