BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation and addition to a mixed-use development in Stoney Creek, Ontario. Completed plans call for the renovation of a 13,932-square-foot fitness / recreation center; and for the addition of a 13,856-square-foot, one-story above grade library.

The Valley Park project involves three major components of work at the existing community centre at 970 Paramount Dr. in Hamilton, Ontario: a. New library addition b. Recreation centre interior renovation c. Facility Mechanical/Electrical improvements and Building Envelope upgrades with existing Parking Lot resurfacing The new library addition will be a 1,283 square metres (M2) state of the art addition that includes full service library with lobby, reception, open seating areas, book stacks, Makerspace rooms, quiet rooms, multipurpose rooms, administration work area, media sorter, staff areas, shipping/receiving, washrooms, and service rooms including a mechanical penthouse. The addition will be registered under the LEED Version 4 New Construction and Major Renovation (LEED v4 BD+C) rating system with an anticipated Certification Level of Gold. The contractor, subcontractors, suppliers and manufacturers are required to participate to achieve LEED certification. In order to support the new library addition, the incoming power to the building is to be revised including a new electrical transformer along with a new solar photovoltaic array on the roof of the library. This project also includes an approximately 1,290 M2 renovation to the existing one-story Community Centre. The scope for this portion of Work includes, but is not limited to, mechanical and electrical systems, interior renovations for new an administration space including reception, programs rooms, washrooms, open seating areas, and service rooms with selective demolition and structural alterations. LEED designation is not applicable. The existing arena and pool/aquatic areas of the building are to receive a complete replacement of Mechanical and Electrical systems including BAS services. Exterior cladding, roofing, and envelope repairs/replacement are to be undertaken around the building. Resurfacing and restriping of the east parking lot is required. Documents are available at: https://hamilton.bidsandtenders.ca

Award

Library

$11,195,200.00

Public - City

Addition, LEED Certification, Renovation

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
129
Bidding Soon
2,439
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2019

March 3, 2020

img_map_placeholder

970 Paramount Dr, Stoney Creek, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.