BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Casselberry, Florida. Completed plans call for site work for a water / sewer project.

The Work specified in the "Scope of Services" generally consists of the rehabilitation and replacement of equipment, materials, and/or structures at the Water Reclamation Facility to include the Traveling Bridge Filter, Chlorine Contact Chamber, Transfer Pump Station, and Effluent Pump Station. 1.Construction of a series of improvements to the existing Traveling Bridge Filter System including removal and replacement of the existing filter media; replacement of the existing festoon system, trolley and cabling system; replacement of the existing rail system; adjustments and rehab of the washwater hood system; and replacement of wheels, shafts bearings, gearbox and motor, wear strips and backwash shoes, control panels, and limit switches as called for in the Contract Drawings. Repair of existing concrete including replacement of the northwest access stairs. 2. Improvements to the existing Chlorine Contact Chamber including replacement of existing influent and drain valves, structural rehabilitation and coating of the interior walls, and replacement of the existing sidewalk between the Traveling Bridge Filters and the Chlorine Contact Chamber. 3. Improvements to the existing Transfer Pump Station including replacement of the two vertical turbine pumps, installation of discharge piping, fittings, gate valves, pressure sustaining valves, necessary accessories, construction of new housekeeping pads, repair of concrete, coatings for the wet well and inside of the masonry building, and coating of the existing control panels. 4. Improvements to the existing Effluent Pump Station including replacement of three of the vertical, canned pumps (including discharge piping, fittings, valves, and necessary accessories), inspection and structural assessment of the existing pump cans, improvements to electrical, and replacement of the existing concrete slab." WRF Improvements at 700 Cross Street, Casselberry, Florida 32707 Question End Date 8/22/2019 2:00 PM Anticipated Award Date 9/23/2019 Piggyback Solicitation No Insurance Required Yes Bid Bond Required Yes

Award

Water / Sewer

$1,528,130.00

Public - City

Site Work

Subscribe For Documents

127 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
90
Bidding Soon
1,289
All Active Projects
538
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2019

November 15, 2019

img_map_placeholder

700 Cross St, Casselberry, FL

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.