BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a warehouse / distribution facility in Rochester, Minnesota. Completed plans call for the renovation of a warehouse / distribution facility.

**Project will rebid in the future, no date yet** If a pre-bid meeting has been scheduled, the County reserves the right to entertain or reject additional requests for site visits from Bidders. Please note that any exchange of information that takes place during a site visit must be formalized in order to be considered valid. All questions, exceptions and/or suggestions to improve the intent of the project documents shall be submitted on or before the deadline for questions via online. The work associated with the removal and replacement of portions of the sidewall of the quench reactor vessel shall be performed between Monday, September 16, 2019 and Friday, September 20, 2019. All other work associated with preparation of the work are and insulation and lagging installation shall be completed between Monday, September 9, 2019 and Wednesday, September 25, 2019. These dates are subject to change depending on plant operations; however, reasonable notice will be given to the awarded Contractor if a change occurs. This project is to replace a portion of the sidewall of the quench reactor (QR) 2 vessel located at the Olmsted Waste to Energy Facility (OWEF) in Rochester, Minnesota. The OWEF is a waste-fired cogeneration power plant located in Rochester Minnesota that is owned and operated by Olmsted County. The OWEF provides heating, cooling, electric power, and other utility services to a number of local buildings. The primary fuel for the OWEF is Municipal Solid Waste (MSW), with natural gas and light fuel oil serving as backup fuels. OWEF plant consists of two (2) 100 ton-per-day and one (1) 200 ton-per-day MSW waste combustor boiler units of the mass-burn water-cooled wall design, three (3) steam turbinegenerators, Municipal Solid Waste receiving facility, ash handling systems, air pollution control equipment, necessary auxiliary installations, the medium voltage work necessary to connect with the utility grid, and a natural gas fired backup boiler. Question Cutoff Date 11/1/2019 03:00:00 PM (ET)

Award

Warehouse / Distribution

$182,093.00

Public - County

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
75
Bidding Soon
774
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2019

January 13, 2020

img_map_placeholder

301 Silver Creek Rd NE, Rochester, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.