BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Saint Paul, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Construction Services for site improvements at the Gortner Lab East Loading Dock, located on the St. Paul campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. Site / Project Description The proposed project consists of the construction of a new fire lane/access road along Gortner Avenue at the St. Paul Campus of the University of Minnesota. NTI also understands the construction of the proposed fire lane will include construction over top of an existing tunnel. The proposed fire lane is intended to support a fire truck with a gross vehicle weight of 80,000 pounds and a rear tandem axle weight of 60,000 pounds, without damaging the steam tunnel. 2.2 Scope of Services The purpose of this report is to present a summary of our geotechnical exploration and provide generalized opinions and recommendations regarding the soil conditions and design parameters for founding of the project. Our scope of services was limited to the following: 1. Explore the project subsurface by means of 2standard penetration test borings extending to depths of approximately 20 feet below existing grade, and conduct laboratory test(s) on representative samples for characterizing the index and engineering properties of the soils at the project site. Additional exploration by means of a Ground Penetrating Radar (GPR) survey to identify the depth of the tunnel and the presence of reinforcing steel. 2. Prepare a report presenting our findings from our field exploration, laboratory testing, and engineering recommendations for foundation types, footing depths, allowable bearing capacity, estimated settlements, excavation, engineered fill, backfill, compaction and potential construction difficulties related to excavation, backfilling and drainage, and lateral earth pressures.

Award

Water / Sewer

$750,000.00

Public - State/Provincial

Paving, Site Work

18

17

45

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
82
Bidding Soon
785
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

June 19, 2024

img_map_placeholder

1479 Gortner Ave, Saint Paul, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.