Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a power facility in Rochester, Minnesota. Completed plans call for the renovation of a power facility.
This project is for the installation of the Owner supplied drive on the Slip Stick vibrating conveyor. Contractors should come prepared with steel toe shoes, safety glasses, hearing protection and hard hats. An overview of the County's electronic bidding process will also be discussed during Pre-Bid Meeting. Project description: This project is to replace the existing drive on the Slip Stick vibrating conveyor located at the Olmsted Waste to Energy Facility (OWEF) in Rochester, Minnesota. The OWEF is a waste-fired cogeneration power plant located in Rochester Minnesota that is owned and operated by Olmsted County. The OWEF provides heating, cooling, electric power, and other utility services to a number of local buildings. The primary fuel for the OWEF is Municipal Solid Waste (MSW), with natural gas and light fuel oil serving as backup fuels. OWEF plant consists of two (2) 100 ton-per-day and one (1) 200 ton-per-day MSW waste combustor boiler units of the mass-burn water-cooled wall design, three (3) steam turbinegenerators, Municipal Solid Waste receiving facility, ash handling systems, air pollution control equipment, necessary auxiliary installations, the medium voltage work necessary to connect with the utility grid, and a natural gas fired backup boiler. The two (2) 100 ton-per-day Riley/Takuma waste combustor boiler units were commissioned in 1987. Unit 1 and Unit 2 are of the stoker fired, water-cooled wall, excess air type. Unit 1 and Unit 2 supply about 25-30 kpph of live steam each, at 610 psig/ 610- 650 degrees F. The one (1) 200 ton-per-day AEEVR/ Duro Dakovich waste combustor boiler unit was commissioned in 2010. Unit 3 is also a stoker fired, water-cooled wall, excess air type. Unit 3 supplies 57-63 kpph of live steam, at 610 psig/ 610-650 degrees F. The 75 kpph dual fuel Nebraska packaged boiler unit provides backup steam at 250 psig saturated conditions for use during the waste combustor-boiler shutdowns. Electrical power is generated with one (1) backpressure steam turbine-generator unit of 1.86-MW nominal capacity (TG1), one (1) condensing steam turbine-generator unit of 2.22-MW nominal capacity (TG2), and one (1) condensing/ extraction steam turbinegenerator unit of 5.4-MW nominal capacity (TG3). TG1 and/or TG3 supply steam to a 60-psig header used primarily for the OWEF district energy system; TG2 exhausts into air-cooled condenser 1; and TG3 exhausts into air-cooled condenser 2. Steam from the 600-psig header is also cascaded to supply 250-psig steam headers through a pressure reducing and desuperheating stations. The facility operates continuously twenty-four (24) hours per day, seven (7) days per week, fifty-two (52) weeks every year. The planned operating schedule of each boiler allows normal planned maintenance to be accomplished without interrupting the supply of steam or electricity. There are currently three (3) scheduled maintenance shutdowns per year for Unit 1 and Unit 2 and two (2) scheduled maintenance shutdowns per year for Unit 3. Outage duration varies depending on the time of year, but normally requires about two (2) weeks for Unit 1 or Unit 2 and four (4) weeks for Unit 3. Outages typically do not occur simultaneously. This project shall have all work specified below performed as a turnkey service, unless indicated otherwise in this specification. The contractor shall supply all supervision, labor, and tools for all work conducted onsite. This work shall be performed between Monday, October 14, 2019 and Friday, October 18, 2019. These dates are subject to change depending on plant operations; however, reasonable notice will be given to the awarded Contractor if a change occurs.
Award
Power Plant
$6,500.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2019
October 14, 2019
301 Silver Creek Rd NE, Rochester, MN
Related To This Project
Rochester, MN
Bid Date: Sep 12 2019
Rochester, MN
Bid Date: Jun 21 2019
Rochester, MN
Bid Date: May 10 2019
Rochester, MN
Bid Date: Apr 24 2019
Rochester, MN
Bid Date: Apr 04 2019
Rochester, MN
Bid Date: May 24 2019
Rochester, MN
Bid Date: Jan 21 2020
Rochester, MN
Bid Date: Apr 03 2020
Rochester, MN
Bid Date: Oct 25 2019
Rochester, MN
Bid Date: Oct 01 2019
Rochester, MN
Bid Date: Oct 01 2020
Rochester, MN
Bid Date: Feb 28 2020
Rochester, MN
Bid Date: Mar 20 2020
Rochester, MN
Bid Date: Feb 19 2021
Rochester, MN
Bid Date: Jun 04 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.