Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Shelby Township, Michigan. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
https://www.mdjonline.com/tribune/regional/shelden-trails-at-stony-creek-metropark-is-a-recreation-destination/article_19d9efee-eeff-5f58-b5d7-eb95e647481e.html Shelden Trails at Stony Creek Metropark is a recreation destination May 29--If you want to see who appreciates the Shelden Trails Redevelopment Project at Stony Creek Metropark visit the trail. On a nice day it's filled with riders of all ages. Children following their parents. Mountain bike enthusiasts racing through the obstacles. Newbies putting themselves and their shiny new bicycles to the test. "It's awesome," said Gary Hopp, superintendent of Stony Creek, Lake St. Clair and Wolcott Mill Metroparks, of the completed trail system that winds its way up and down in loops around some of the prettiest areas of Stony Creek Metropark. "We've been working on it for a lot of years." Hopp said there's been a trail system in place for decades but it had become outdated. A master plan was created with input and recommendations from partners and regular users in 2016. Two-years later the Huron-Clinton Metroparks began its multi-year redevelopment project with a goal to extend and develop Shelden Trails into a premier multi-use, natural surface trail system in southeast Michigan. So, instead of driving to other areas known to have outstanding trail systems, riders can make Stony Creek their destination. In June 2020 the first phase of construction began. The project included redeveloping existing trails to improve user experience, accessibility, trail surface condition and signage. New trail segments, a beginner loop (Grom trail), a handcycle accessible trail and new mountain bike obstacles were added. Once a loop was completed it would be opened up for riders. Now it's done in time for the summer season. "The project was originally envisioned as being volunteer led, but the more we got into the project and the more we understood the great need for the project in the region, the Metroparks understood we needed to step up and provide additional resources and expertise to develop it into the world class trail system it is today," said Amy McMillan, director of the Metroparks. A large portion of Shelden Trails travel through the old Shelden estate, and were developed mainly from former roads, footpaths, and trails. The roads and footpaths ran among the estate's nine buildings (no longer in existence). Shelden estate was gifted to Stony Creek Metropark by Elizabeth Shelden in 1981 for public recreation. One of the reasons everyone is excited is because everyone will be able to use it. "There's something for every level of rider or trail user," Hopp said. The Metroparks worked closely with an advisory group, including the Clinton River Area Mountain Bike Association, to provide input. The outcome was a collaborative development process that highlighted problem areas of the previous trails and the development of a premier experience today. "The Metroparks is looking for opportunities throughout all of our parks to provide better user experience and accessibility to all of our really great facilities, and here at Shelden Trails is no different," McMillan said. The Shelden Trails Redevelopment Project cost just over $812,000, supported by Metroparks budget dollars and a long list of generous partners and donors. _____________________________________________________________________________________________________________________________ Huron-Clinton Metropolitan Authority (HCMA) is requesting proposals from qualified, professional vendors for construction of natural surface trails at Stony Creek Metropark. Communication regarding this project may only be made with the Contracting Officer, Heidi Dziak, CPPB, Senior Buyer at heidi.dziak@metroparks.com. General Requirements - Insurance Required - Bid Deposit Required Questions Are Submitted Online: No Question Acceptance Deadline: 02/14/2020 12:00 PM EST The method of contractor selection has not been determined at this time.
Conceptual
Sidewalks / Parking Lot
$200,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2022
4300 Main Park Dr, Shelby Township, MI
Related To This Project
Shelby Township, MI
--
Shelby Township, MI
Bid Date: Jan 03 2023
Shelby Township, MI
Bid Date: Jun 07 2022
Shelby Township, MI
Bid Date: May 17 2022
Shelby Township, MI
Bid Date: Jun 30 2022
Shelby Township, MI
--
Shelby Township, MI
--
Shelby Township, MI
--
Shelby Township, MI
Bid Date: May 05 2022
Shelby Township, MI
Bid Date: May 05 2022
Shelby Township, MI
Bid Date: May 19 2022
Shelby Township, MI
Bid Date: May 19 2022
Shelby Township, MI
--
Shelby Township, MI
--
Shelby Township, MI
Bid Date: Apr 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.