Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 24, 2023 at 7:00 PM
Updated January 25, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Towanda, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The description and location of the project are as follows: For bridge replacement including removal of existing culvert, construction of a precast concrete box culvert over a tributary to Towanda Creek, selected borrow excavation rock, milling, Superpave Asphalt Mixture Design base, binder, scratch, and wearing courses, guide rail upgrades, tree plantings, incorporated utility work (relocation of existing water main), right-of-way fence, and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 220, SECTION 233, in Towanda Township, from approximately 1.6 miles northeast of the intersection with SR 3009 at Segment 0320 Offset 1431, to approximately 0.6 miles southwest of the intersection with SR 2027 at Segment 0320 Offset 2116, and STATE ROUTE 220, SECTION 196, in Towanda Borough and Towanda and Monroe Townships, approximately 0.2 miles northeast of the intersection with SR 3009 at Segment 0290 Offset 1864, to approximately 0.2 miles southwest of the intersection with SR 2027 at Segment 0330 Offset 0361, and STATE ROUTE 220, SECTION 212, in New Albany Borough and Ulster Township, from approximately 150 feet north of the intersection with SR 3002 at Segment 0080 Offset 1211, to approximately 100 feet north of the intersection with SR 1022 at Segment 0570 Offset 0037, all in BRADFORD COUNTY. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 12.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE REPLACEMENT 408 Version: 2020-5 DBE: 2% PADOT - SR 220 over Trb Towanda Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$2,356,356.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 15, 2022
January 30, 2023
SR 220, Towanda, PA
Related To This Project
Towanda, PA
Bid Date: May 03 2022
Towanda, PA
Bid Date: May 10 2022
Towanda, PA
Bid Date: Feb 05 2020
Towanda, PA
Bid Date: Apr 04 2022
Towanda, PA
Bid Date: Aug 25 2022
Towanda, PA
Bid Date: Sep 19 2022
Towanda, PA
Bid Date: Nov 15 2021
Towanda, PA
--
Towanda, PA
Bid Date: Oct 06 2022
Shrewsbury Township, PA
--
Leeper, PA
Bid Date: Nov 15 2022
Maxatawny Township, PA
Bid Date: Jan 09 2025
Shenango Township, PA
--
Turbot Township, PA
--
Mountain Top, PA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
