BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Towanda, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The description and location of the project are as follows: For bridge replacement including removal of existing culvert, construction of a precast concrete box culvert over a tributary to Towanda Creek, selected borrow excavation rock, milling, Superpave Asphalt Mixture Design base, binder, scratch, and wearing courses, guide rail upgrades, tree plantings, incorporated utility work (relocation of existing water main), right-of-way fence, and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 220, SECTION 233, in Towanda Township, from approximately 1.6 miles northeast of the intersection with SR 3009 at Segment 0320 Offset 1431, to approximately 0.6 miles southwest of the intersection with SR 2027 at Segment 0320 Offset 2116, and STATE ROUTE 220, SECTION 196, in Towanda Borough and Towanda and Monroe Townships, approximately 0.2 miles northeast of the intersection with SR 3009 at Segment 0290 Offset 1864, to approximately 0.2 miles southwest of the intersection with SR 2027 at Segment 0330 Offset 0361, and STATE ROUTE 220, SECTION 212, in New Albany Borough and Ulster Township, from approximately 150 feet north of the intersection with SR 3002 at Segment 0080 Offset 1211, to approximately 100 feet north of the intersection with SR 1022 at Segment 0570 Offset 0037, all in BRADFORD COUNTY. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 12.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE REPLACEMENT 408 Version: 2020-5 DBE: 2% PADOT - SR 220 over Trb Towanda Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$2,356,356.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

93

13

92

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
65
Bidding Soon
684
All Active Projects
357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

January 30, 2023

img_map_placeholder

SR 220, Towanda, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.