Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Bel Air, Maryland. Completed plans call for the renovation of a educational facility.
**As of August 06, 2020, the project has been awarded to Simpson of Maryland, Inc. but awarded amount is not available.** Cost - $1,000,000 to $2,500,000 The MBE Goal Percentage for the bid CAG 20-4, Hickory Elementary Comprehensive Roof Replacement Project shall be 25% with the following subgoals: 7% African-American Owned & 4% Asian-American Owned. The Work includes replacement of approximately 61,776 square feet of new roofing. The work on Roof A will include demolition 14,804 square feet of BUR roofing replaced with 14,804 square feet of EPDM roofing. The work on Roof B will include demolition 8,814 square feet of BUR roofing replaced with 8,814 square feet of EPDM roofing. The work on Roof C will include demolition 785 square feet of BUR roofing replaced with 785 square feet of EPDM roofing. The work on Roof D will include demolition 2,069 square feet of BUR roofing replaced with 2,069 square feet of EPDM roofing. The work on Roof E will include demolition 1,850 square feet of BUR roofing replaced with 1,850 square feet of EPDM roofing. The work on Roof F will include demolition of 2,377 square feet of BUR roofing replaced with 2,377 square feet of EPDM roofing. The work on Roof G will include demolition of 825 square feet of BUR roofing replaced with 825 square feet of EPDM roofing. The work on Roof H include demolition of 169 square feet of BUR roofing replaced with 169 square feet of EPDM roofing. The work on Roof I will include demolition of 3,876 square feet of BUR roofing replaced with 3,876 square feet of EPDM roofing. The work on Roof J will include demolition of 998 square feet of BUR roofing replaced with 998 square feet of EPDM roofing. The work on Roof K will include demolition of 3,869 square feet of BUR roofing replaced with 3,869 square feet of EPDM roofing. The work on Roof L will include demolition of 5,530 square feet of BUR roofing replaced with 5,530 square feet of EPDM roofing. The work on Roof M will include demolition of 1,112 square feet of BUR roofing replaced with 1,112 square feet of EPDM roofing. The work on Roof N will include demolition of 1,102 square feet of BUR roofing replaced with 1,102 square feet of EPDM roofing. The work on Roof O will include demolition of 3,524 square feet of BUR roofing replaced with 3,524 square feet of EPDM roofing. The work on Roof P will include demolition of 9,167 square feet of BUR roofing replaced with 9,167 square feet of EPDM roofing. The work on Roof Q will include demolition of 2,064 square feet of BUR roofing replaced with 2,064 square feet of EPDM roofing. The work on Roof R will include demolition of 4,526 square feet of BUR roofing replaced with 4,526 square feet of EPDM roofing. The work on Roof S will include demolition of 519 square feet of BUR roofing replaced with 519 square feet of EPDM roofing. The work on Roof T will include demolition of 5,476 square feet of BUR roofing replaced with 5,476 square feet of EPDM roofing. Upon removal of the existing roofing, the roof deck will be inspected for damaged areas. Damaged wood, lightweight concrete or metal decking will be replaced per the approval and direction of Harford County Public Schools representatives and the Architect. Upon completion of the deck replacement, new rigid insulation will be installed on the roofs at a minimum slope of ¼ inch. An EPDM roof will be installed over the rigid insulation. All roof drains, flashings, counter flashings, expansion joints, downspouts, etc. will be replaced on the roofs, per the drawings. The work also includes installation of roof ladders, mechanical, and electrical.
Award
Educational
$2,500,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2020
June 15, 2020
2100 Conowingo Rd, Bel Air, MD
Related To This Project
Bel Air, MD
Bid Date: Oct 30 2018
Bel Air, MD
Bid Date: Apr 23 2019
Bel Air, MD
Bid Date: Feb 16 2022
Bel Air, MD
--
Bel Air, MD
Bid Date: Jul 22 2021
Bel Air, MD
Bid Date: Mar 16 2022
Bel Air, MD
--
Bel Air, MD
Bid Date: Oct 19 2021
Bel Air, MD
Bid Date: Jan 19 2022
Bel Air, MD
Bid Date: Dec 22 2021
Bel Air, MD
Bid Date: Dec 08 2021
Bel Air, MD
Bid Date: Jan 04 2022
Bel Air, MD
Bid Date: Jan 05 2022
Bel Air, MD
Bid Date: Dec 22 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.