BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Toronto, Ontario. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Redesign the taxi pick-up and drop-off area for Billy Bishop Toronto City Airport, while creating a new parking area and extensive improvements to the surrounding landscaping and public realm for a new public park at 3 & 5 Eireann Quay (aka the Canada Malting property). New tree plantings are planned to the immediate north and east of the taxi stand, helping to create a visual and sound buffer between airport traffic and the new waterfront public space to the southeast, as well as the TDSB school playground to the north. Similarly, a row of new trees would be planted at the west end of the new surface parking lot to help keep the north end of the public space enjoyable for park-goers. A new canopy above the taxi loop would replace the aging canopy that exists just north of the administrative building, proposed to be constructed atop helical pile supports, utilizing stainless steel tensioned cables, painted steel, and laminated glass. TIMELINE: The site plan application for the proposed changes to the site has resubmitted to the city of Toronto September 2020. The owner is reviewing comments from various City staff as part of the technical review process. The latest application for SPA responds to the comments with a number of minor revisions, while it reveals more details of the Montgomery Sisam Architects-designed improvements. The new public space west and north from the current west end of Ireland Park, combining with the existing park to surround the Canada Malting Silos including new public space and landscaping surrounding the two-storey Art Deco administrative office building of the Canada Malting Company, has gone ahead and is followed separately. All designs have been completed. Request for tender is expected Q1 2024. Construction timing will be finalized spring/summer, 2024.

Final Planning

Sidewalks / Parking Lot

$10,000,000.00

Public - Federal

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
107
Bidding Soon
2,492
All Active Projects
982
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.