BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Baltimore, Maryland. Completed plans call for the renovation of a municipal facility.

**As of December 4, 2019, the project has not yet been awarded.** The modernization of the building elevator systems both traction and hydraulic. Carefully review the Department of General Services Instructions to Bidders for Construction Projects (March 2007) and General Conditions for Construction Contracts (July 2018) which are attached to this solicitation. The project classification for this solicitation is: D ($1,000,000 to $2,500,000) The MBE subcontracting participation goal for this solicitation is: 10% (NO Split) The MBE participation shall be a percentage of the BASE BID. If the bidder fails to accurately complete and submit MBE Attachment D-1A with the bid, the procurement officer shall deem the bid non-responsive and reject the bid. Please refer to the MDOT MBE Directory at online to determine if a firm is certified with the appropriate North American Industry Classification System (NAICS) Code and the product/services description. Only those specific products and/or services for which a firm is certified in the MDOT Directory can be used for purposes of achieving the MBE participation goals. If, for any reason, the apparent successful bidder is unable to achieve the contract goal for each certified MBE classification specified as having a subcontract goal or the overall MBE contract goal, the bidder will be contacted to document its waiver request as stated in the Minority Business Enterprise Utilization Procedures - November 2017. Please review all MBE information carefully. Refer to the Minority Business Enterprise Utilization Procedures - November 2017 for further information. The work shall be completed within 480 calendar days from the start date of the contract. If the work is not completed within the time period specified, the contractor will be liable for liquidated damages of $750.00 per calendar day as specified in the General Conditions The deadline for questions has been established as September 18, 2019 @ 2:00 p.m., to ensure that there is enough time to allow for the A/E to provide responses and possible Addendum issuance if necessary. Prevailing wage rates apply to all contracts in the amount of $500,000 or more. Wage rates applicable to projects of $500,000 or more are attached to the specifications.

Award

Municipal

$1,164,696.00

Public - State/Provincial

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
101
Bidding Soon
2,426
All Active Projects
978
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2019

November 8, 2019

img_map_placeholder

2301 Argonne Dr, Baltimore, MD


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.