BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in St Thomas, Ontario. Working plans call for the construction of a 5,500-square-foot, one-story above grade municipal facility.

The Corporation of the City of St. Thomas (the City) is issuing this Request for Pre-Qualification (RFPQ) to solicit responses from interested, qualified, contractors (Respondents) who can undertake the construction of a new Animal Services Centre as noted in the RFPQ documents. Previous experience in delivering projects on time and budget are of the highest importance along with clear and demonstrated experience. Firms with less than five (5) years of experience under the current legal name will not be considered for this RFPQ. Construction will commence in Spring 2025 or earlier should the successful Respondent be able to. The project will consist of a new building built to current Animals for Research Act and the Pounds Act guidelines that include administrative staff, public, clinical, food preparation, intake, animal segregation, and outdoor exercise areas. This is the first stage in a two-stage process. It is anticipated that a request for tender will be issued in mid-October after the closing time of this RFPQ. The work required to be completed, following the award of the second stage RFT, includes the supply of labour, material, equipment, site offices, permits, and other requirements as necessary to complete the construction as shown in the Contract Drawings and as specified herein. The following is a general, but not necessarily complete, description of the work to be constructed under the Contract: - All required site works including preparation and restoration. - Construction of an approximately 5,500 ft2 animal services facility. - Required water, sanitary, gas and electrical connections. - An operational animal shelter facility with complete fit-up; including staff furnishings, millwork, kennels. - Asphalt entry way and parking lot construction. Documents can be obtained at: https://stthomas.bidsandtenders.ca Question Deadline: Tue Sep 24, 2024 12:00:00 PM (EDT) Shortlist Confirmed.

Final Planning

Municipal

$3,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
37
Bidding Soon
858
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

May 1, 2025

img_map_placeholder

275 Bill Martyn Pkwy, St Thomas, ON

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.