BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fayetteville, North Carolina. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Contractor shall complete all work as specified or indicated in the contract Documents. The work is generall described as follows: this project is located at the Dam at arran lake along greenock avenue in cumberland county, nc. This project Involves the construction of a cul-de-sac and a dead end to provide the public with A safe way to turn around. Approximately .02 acres of land will be disturbed for The construction of the project within the limits of construction on the plans. Erosion control measures will be placed within the limits of construction at Strategic locations to inhibit the flow of storm water runoff onto site and Prohibit the flow of sediment off site. If the Site, in part or in whole, consists of private property and/or a secured area, then a site tour may be arranged though the City of Fayetteville, at its convenience. Site visit must be coordinated through the following Owner or Engineer contact for visiting the Site: Abha Dwivedy, abhadwivedy@fayettevillenc.gov or Bryan Vickery, bryan.vickery@kimleyhorn.com A Bid must be accompanied by Bid Security made payable to City of Fayetteville in the amount of five (5) percent of the Bidders maximum Bid price (determined by adding the base bid and all alternates). The Project has an expected duration of 90 days. SDBE- 10% Construct Work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the Project completely and fully operable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete Project. 3. Provide the civil, architectural, structural, mechanical, electrical, instrumentation, and all other Work required for a complete and operable Project. 4. Test and place the completed Project in operation. 5. Provide the special tools, spare parts, lubricants, supplies, or other materials as indicated in the Contract Documents for the operation and maintenance of the Project. 6. The Contract Documents do not indicate or describe all Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Engineer Work is described in general, non-inclusive terms as: 1. Cul-de-Sac Construction 2. Dead-End Construction

Bid Results

Water / Sewer

$198,749.00

Public - City

Paving, Site Work

19

24

4

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
77
Bidding Soon
1,238
All Active Projects
473
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2023

March 17, 2023

img_map_placeholder

Greenock Ave, Fayetteville, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.